Ventilation controls.
Blue Creek Mine No. 1 · 010344830 CFR 75.333(h) · $151.00 proposed penalty
Ventilation controls.
Blue Creek Mine No. 1 · 010344830 CFR 75.333(h) · $151.00 proposed penalty
Roof control plan.
Blue Creek Mine No. 1 · 010344830 CFR 75.220(a)(1) · $245.00 proposed penalty
Roof control plan.
Blue Creek Mine No. 1 · 010344830 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Mine ventilation plan; submission and approval.
Blue Creek Mine No. 1 · 010344830 CFR 75.370(a)(1) · $177.00 proposed penalty
Mine ventilation plan; submission and approval.
Blue Creek Mine No. 1 · 010344830 CFR 75.370(a)(1) · $267.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · $245.00 proposed penalty
Preshift examination at fixed intervals.
Blue Creek Mine No. 1 · 010344830 CFR 75.360(g) · $151.00 proposed penalty
Roof Control Technical Investigation
Blue Creek Mine No. 1 · 010344847.0 on-site hours reported
Spot Inspections
Blue Creek Mine No. 1 · 0103448103(i) · 11.0 on-site hours reported
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · $245.00 proposed penalty
Weekly examination.
Blue Creek Mine No. 1 · 010344830 CFR 75.364(g) · $151.00 proposed penalty
Weekly examination.
Blue Creek Mine No. 1 · 010344830 CFR 75.364(g) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · $245.00 proposed penalty
Accumulation of combustible materials.
Blue Creek Mine No. 1 · 010344830 CFR 75.400 · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
Blue Creek Mine No. 1 · 010344830 CFR 75.370(a)(1) · $177.00 proposed penalty
Deenergized underground power circuits; idle days—idle shifts.
Blue Creek Mine No. 1 · 010344830 CFR 75.706 · $151.00 proposed penalty
Mechanical equipment guards.
Blue Creek Mine No. 1 · 010344830 CFR 75.1722(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Compliance with approved slope and shaft sinking plans.
Blue Creek Mine No. 1 · 010344830 CFR 77.1900-1 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Mechanical equipment guards.
Blue Creek Mine No. 1 · 010344830 CFR 75.1722(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Blue Creek Mine No. 1 · 010344830 CFR 75.512 · Significant and substantial (S&S) · $642.00 proposed penalty
Accumulation of combustible materials.
Blue Creek Mine No. 1 · 010344830 CFR 75.400 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.