Vulcan Construction Materials, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
103 (g) Written Notification Hazard Complaint Inspectio
McCook Quarry · 11002252.5 on-site hours reported
Spot Inspection
Central Quarry · 15000168.5 on-site hours reported
Regular Safety and Health Inspection
LIBERTY QUARRY · 380000316.5 on-site hours reported
Regular Safety and Health Inspection
COLUMBIA QUARRY · 380001322.8 on-site hours reported
Regular Safety and Health Inspection
Chattanooga Quarry · 400010733.0 on-site hours reported
Spot Inspection
Riverside Drive Quarry · 40021874.0 on-site hours reported
Handling of materials
Royal Stone · 4400152Perm tot or perm prtl disablty
Accident narrative
Employee pinched right middle finger between plate and wear liner, amputating the top portion of the finger midway on the nail bed, above the top knuckle.
Handling of materials
1604 Quarry · 4101241No dys awy frm wrk,no rstr act
Accident narrative
2 employees were moving a wire cable reel in preparation to pull cable for a new service when one employee lost balance/footing and fell backwards. As they fell backwards, they landed on their rights side, mostly on their right elbow. Employee continued the shift/work as the supervisor and only felt like they bruised their elbow.
Impoundment Spot Inspection
Sycamore Quarry · 11011061.0 on-site hours reported
Regular Safety and Health Inspection
LYMAN QUARRY · 380061223.0 on-site hours reported
Safety defects; examination, correction and records.
Hamburg Quarry · 280001130 CFR 56.14100(b) · $151.00 proposed penalty
Warning signs.
Hamburg Quarry · 280001130 CFR 56.4101 · $151.00 proposed penalty
Handrails and toeboards.
Hamburg Quarry · 280001130 CFR 56.11002 · $151.00 proposed penalty
Regular Safety and Health Inspection
Redstone Quarry · 01035427.0 on-site hours reported
Regular Safety and Health Inspection
Jackson Quarry · 090126416.8 on-site hours reported
Regular Safety and Health Inspection
Grand Rivers Quarry · 150008763.5 on-site hours reported
Housekeeping.
Norcross Quarry · 090007030 CFR 56.20003(b) · $151.00 proposed penalty
Electrical conductors.
Norcross Quarry · 090007030 CFR 56.12004 · $267.00 proposed penalty
Moving machine parts.
Norcross Quarry · 090007030 CFR 56.14107(a) · $151.00 proposed penalty
Electrical conductors.
Sycamore Quarry · 110110630 CFR 57.12004 · $151.00 proposed penalty
Inspection.
Sycamore Quarry · 110110630 CFR 57.4201(a)(5) · $151.00 proposed penalty
New task training.
Helotes Quarry · 410297630 CFR 46.7(c) · Significant and substantial (S&S) · $1,355.00 proposed penalty
Safety defects; examination, correction and records.
Helotes Quarry · 410297630 CFR 56.14100(a) · $151.00 proposed penalty
General requirements.
Helotes Quarry · 410297630 CFR 56.4200(b)(2) · $151.00 proposed penalty
Identification of power switches.
Helotes Quarry · 410297630 CFR 56.12018 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.