United Salt Hockley, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Slip or fall of person
HOCKLEY MINE · 4102478Days away from work only
Accident narrative
Employee was walking around a work table in the shop and their right foot slipped resulting in the employee falling onto the left knee. Resulted in a fracture on the patella
Hoisting
HOCKLEY MINE · 4102478Accident only
Accident narrative
Hoistman went to dump the skip and thought EE wasn't up very far and decided to go down to see on the camera if the skip was full. Lowered the skip and the door was partially opened and caught on a cross member and broke it.
Warning signs.
HOCKLEY MINE · 410247830 CFR 57.4101 · $151.00 proposed penalty
Regular Safety and Health Inspection
HOCKLEY MINE · 410247834.5 on-site hours reported
Housekeeping.
HOCKLEY MINE · 410247830 CFR 57.20003(c) · $209.00 proposed penalty
Correction of hazardous conditions.
HOCKLEY MINE · 410247830 CFR 57.3200 · $209.00 proposed penalty
Regular Safety and Health Inspection
HOCKLEY MINE · 410247824.8 on-site hours reported
Testing grounding systems.
HOCKLEY MINE · 410247830 CFR 57.12028 · $151.00 proposed penalty
Testing grounding systems.
HOCKLEY MINE · 410247830 CFR 57.12028 · $151.00 proposed penalty
Hand-held power tools.
HOCKLEY MINE · 410247830 CFR 57.14116(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
HOCKLEY MINE · 410247822.8 on-site hours reported
Grounding circuit enclosures.
HOCKLEY MINE · 410247830 CFR 57.12025 · $151.00 proposed penalty
Grounding circuit enclosures.
HOCKLEY MINE · 410247830 CFR 57.12025 · $151.00 proposed penalty
Housekeeping.
HOCKLEY MINE · 410247830 CFR 57.20003(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Guarding electrical connections and resistor grids.
HOCKLEY MINE · 410247830 CFR 57.12023 · $151.00 proposed penalty
Regular Safety and Health Inspection
HOCKLEY MINE · 410247826.0 on-site hours reported
Protection for openings around travelways.
HOCKLEY MINE · 410247830 CFR 57.11012 · $151.00 proposed penalty
Moving machine parts.
HOCKLEY MINE · 410247830 CFR 56.14107(a) · $151.00 proposed penalty
Requirement for container labels.
HOCKLEY MINE · 410247830 CFR 47.41(a) · $151.00 proposed penalty
Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.
HOCKLEY MINE · 410247830 CFR 48.7(a) · $168.00 proposed penalty
Regular Safety and Health Inspection
HOCKLEY MINE · 410247833.3 on-site hours reported
Safety defects; examination, correction and records.
HOCKLEY MINE · 410247830 CFR 56.14100(c) · $151.00 proposed penalty
Handtools (nonpowered)
HOCKLEY MINE · 4102478Days away from work only
Accident narrative
Hand Scaling on JLG rock fell and struck employee.
Inspection.
HOCKLEY MINE · 410247830 CFR 56.4201(a)(2) · $151.00 proposed penalty
Requirement for container labels.
HOCKLEY MINE · 410247830 CFR 47.41(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.