Accumulation of combustible materials.
TUNNEL RIDGE MINE · 460886430 CFR 75.400 · $151.00 proposed penalty
Accumulation of combustible materials.
TUNNEL RIDGE MINE · 460886430 CFR 75.400 · $151.00 proposed penalty
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 5.5 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 6.5 on-site hours reported
Health Technical Investigation
TUNNEL RIDGE MINE · 460886410.0 on-site hours reported
Belt air course ventilation.
TUNNEL RIDGE MINE · 460886430 CFR 75.350(a)(2) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
TUNNEL RIDGE MINE · 460886430 CFR 75.1731(b) · $151.00 proposed penalty
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 5.8 on-site hours reported
Slip or fall of person
TUNNEL RIDGE MINE · 4608864Days away from work only
Accident narrative
Employee was strapping down a load on a supply car while standing on the car at the Battle Run yard, slipped on ice, and fell to the ground. EE worked EE's normal job until going off for surgery on 04/16/2026.
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 5.8 on-site hours reported
Health Technical Investigation
TUNNEL RIDGE MINE · 460886411.0 on-site hours reported
Roof control plan.
TUNNEL RIDGE MINE · 460886430 CFR 75.220(a)(1) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
TUNNEL RIDGE MINE · 460886430 CFR 75.202(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
TUNNEL RIDGE MINE · 460886430 CFR 75.1731(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Accumulation of combustible materials.
TUNNEL RIDGE MINE · 460886430 CFR 75.400 · $336.00 proposed penalty
Ventilation Technical Investigation
TUNNEL RIDGE MINE · 460886420.0 on-site hours reported
Multi-gas detectors.
TUNNEL RIDGE MINE · 460886430 CFR 75.1714-7(a) · $1,126.00 proposed penalty
Accumulation of combustible materials.
TUNNEL RIDGE MINE · 460886430 CFR 75.400 · $151.00 proposed penalty
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 5.8 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 6.3 on-site hours reported
Methane monitors.
TUNNEL RIDGE MINE · 460886430 CFR 75.342(a)(4) · $313.00 proposed penalty
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 5.5 on-site hours reported
Accumulation of combustible materials.
TUNNEL RIDGE MINE · 460886430 CFR 75.400 · $151.00 proposed penalty
Health Technical Investigation
TUNNEL RIDGE MINE · 46088646.5 on-site hours reported
Roof control plan.
TUNNEL RIDGE MINE · 460886430 CFR 75.220(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.