TUNNEL RIDGE, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
TUNNEL RIDGE MINE · 4608864364.8 on-site hours reported
Fall of roof or back
TUNNEL RIDGE MINE · 4608864Accident only
Accident narrative
An unintentional roof fall measuring 16' long by 8' wide by 6.5' above anchorage occurred in the East Mains #1 track entry at 62 crosscut.
Fall of roof or back
TUNNEL RIDGE MINE · 4608864Accident only
Accident narrative
An unintentional roof fall measuring 24' long by 16' wide by 6.5' above anchorage occurred in the East Mains #1 track entry at 20 crosscut.
Health Technical Investigation
TUNNEL RIDGE MINE · 46088646.0 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 6.0 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 7.0 on-site hours reported
Criteria—Belt conveyors.
TUNNEL RIDGE MINE · 460886430 CFR 75.1403-5(g) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
TUNNEL RIDGE MINE · 460886430 CFR 75.202(a) · $151.00 proposed penalty
Other safeguards.
TUNNEL RIDGE MINE · 460886430 CFR 75.1403 · $165.00 proposed penalty
Machinery
TUNNEL RIDGE MINE · 4608864No dys awy frm wrk,no rstr act
Accident narrative
The employee was side bolting off the Joy full-face continuous miner. As they attempted to position a piece of welded-wire roof mesh over the machine, the mesh recoiled back and struck them above the left eye, just above their prescription safety glasses.
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 5.0 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 4.0 on-site hours reported
Other safeguards.
TUNNEL RIDGE MINE · 460886430 CFR 75.1403 · $151.00 proposed penalty
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 6.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
TUNNEL RIDGE MINE · 460886430 CFR 75.1731(b) · $151.00 proposed penalty
Ventilation controls.
TUNNEL RIDGE MINE · 460886430 CFR 75.333(d)(3) · $151.00 proposed penalty
Health Technical Investigation
TUNNEL RIDGE MINE · 460886410.8 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 11.0 on-site hours reported
Accumulation of combustible materials.
TUNNEL RIDGE MINE · 460886430 CFR 75.400 · $151.00 proposed penalty
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 4.8 on-site hours reported
Quantity and location of firefighting equipment.
TUNNEL RIDGE MINE · 460886430 CFR 75.1100-2(d) · $151.00 proposed penalty
Other safeguards.
TUNNEL RIDGE MINE · 460886430 CFR 75.1403 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
TUNNEL RIDGE MINE · 460886430 CFR 75.1731(b) · $151.00 proposed penalty
Health Technical Investigation
TUNNEL RIDGE MINE · 460886410.8 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 6.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.