Tahiti Energy, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Drill dust control at surface mines and surface areas of underground mines.
680-S1 · 151997730 CFR 72.620 · Significant and substantial (S&S) · $209.00 proposed penalty
Highwalls, pits and spoil banks; plans.
680-S1 · 151997730 CFR 77.1000 · $151.00 proposed penalty
Permissible exposure level.
SPURLOCK PLANT · 151597830 CFR 62.130(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
UG #1 · 151924271.3 on-site hours reported
Machinery and equipment; operation and maintenance.
SPURLOCK PLANT · 151597830 CFR 77.404(a) · Significant and substantial (S&S) · $226.00 proposed penalty
Cable fittings; suitability.
SPURLOCK PLANT · 151597830 CFR 77.505 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
SPURLOCK PLANT · 151597830 CFR 77.1110 · $151.00 proposed penalty
Special Emphasis Programs
Newman Branch S1 · 15199511.0 on-site hours reported
Identification of circuit breakers.
SPURLOCK PLANT · 151597830 CFR 77.904 · $151.00 proposed penalty
Travelways at surface installations.
SPURLOCK PLANT · 151597830 CFR 77.205(a) · Significant and substantial (S&S) · $177.00 proposed penalty
Accumulations of combustible materials.
680-S1 · 151997730 CFR 77.1104 · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
680-S1 · 151997730 CFR 77.410(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
680-S1 · 1519977155.8 on-site hours reported
Powered haulage
SPURLOCK PLANT · 1515978Days restricted activity only
Accident narrative
The employee was going down the hill to dump the truck so that EE could do repairs on it. As employee was going down the hill EE lost control and was thrown from the truck.
Non-Fatal Accident Investigation
SPURLOCK PLANT · 1515978169.3 on-site hours reported
Violation — cited standard not reported
SPURLOCK PLANT · 1515978Electric equipment; examination, testing, and maintenance.
Newman Branch S1 · 151995130 CFR 77.502 · $151.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection; minimum requirements.
Newman Branch S1 · 151995130 CFR 77.506-1 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Newman Branch S1 · 151995130 CFR 77.502 · $151.00 proposed penalty
Accumulations of combustible materials.
Newman Branch S1 · 151995130 CFR 77.1104 · $151.00 proposed penalty
Accumulations of combustible materials.
Newman Branch S1 · 151995130 CFR 77.1104 · $151.00 proposed penalty
Spot Inspection
Newman Branch S1 · 151995124.3 on-site hours reported
Examination and maintenance of firefighting equipment.
SPURLOCK PLANT · 151597830 CFR 77.1110 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
SPURLOCK PLANT · 151597830 CFR 77.1110 · $151.00 proposed penalty
Accumulations of combustible materials.
SPURLOCK PLANT · 151597830 CFR 77.1104 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.