Stoudt's Ferry Preparation Company Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electric equipment; examination, testing, and maintenance.
Auburn Preparation Plant · 360789230 CFR 77.502 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Oaks Plant · 360832230 CFR 50.30(a) · $151.00 proposed penalty
Travelways at surface installations.
Oaks Plant · 360832230 CFR 77.205(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Oaks Plant · 360832213.5 on-site hours reported
Regular Safety and Health Inspection
Auburn Preparation Plant · 360789224.0 on-site hours reported
Regular Safety and Health Inspection
Mount Penn Preparation Plant · 360695410.5 on-site hours reported
Records of training.
Mount Penn Preparation Plant · 360695430 CFR 48.9(a) · $267.00 proposed penalty
Mechanical equipment guards.
Mount Penn Preparation Plant · 360695430 CFR 77.400(c) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Mount Penn Preparation Plant · 360695430 CFR 77.1605(k) · $267.00 proposed penalty
Travelways at surface installations.
Mount Penn Preparation Plant · 360695430 CFR 77.205(a) · $151.00 proposed penalty
Spot Inspection
Mount Penn Preparation Plant · 36069549.8 on-site hours reported
Spot Inspection
Oaks Plant · 36083228.3 on-site hours reported
Compliance Follow-up Inspection
Mount Penn Preparation Plant · 36069541.5 on-site hours reported
Compliance Follow-up Inspection
Mount Penn Preparation Plant · 36069543.3 on-site hours reported
Compliance Follow-up Inspection
Mount Penn Preparation Plant · 36069541.5 on-site hours reported
Surface installations; general.
Mount Penn Preparation Plant · 360695430 CFR 77.200
Written safety program.
Oaks Plant · 360832230 CFR 77.2102(a) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Oaks Plant · 360832230 CFR 77.1606(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
Auburn Preparation Plant · 360789218.5 on-site hours reported
Openings in surface installations; safeguards.
Auburn Preparation Plant · 360789230 CFR 77.204 · Significant and substantial (S&S) · $432.00 proposed penalty
Travelways at surface installations.
Auburn Preparation Plant · 360789230 CFR 77.205(e) · Significant and substantial (S&S) · $193.00 proposed penalty
Surface installations; general.
Mount Penn Preparation Plant · 360695430 CFR 77.200 · $320.00 proposed penalty
Quantity and location of firefighting equipment.
Mount Penn Preparation Plant · 360695430 CFR 77.1109(e)(1) · $151.00 proposed penalty
Identification of circuit breakers.
Mount Penn Preparation Plant · 360695430 CFR 77.904 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Mount Penn Preparation Plant · 360695430 CFR 77.1606(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.