Stavola Construction Materials, Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Compliance Follow-up Inspection
Stavola Construction Materials, Inc. · 28000151.8 on-site hours reported
Compliance Follow-up Inspection
Stavola Construction Materials, Inc. · 28000150.0 on-site hours reported
Compliance Follow-up Inspection
Stavola Construction Materials, Inc. · 28000150.0 on-site hours reported
Compliance Follow-up Inspection
Stavola Construction Materials, Inc. · 28000153.8 on-site hours reported
Powered haulage
Stavola Construction Materials, Inc. · 2800015Dys awy frm wrk & restrctd act
Accident narrative
Employee was cleaning the C-3 Conveyor Deck with a shovel while the plant was running. EE's Left Hand got caught by a trough Idler and was pinched between the belt & idler.
Brakes.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14101(a)(2) · $151.00 proposed penalty
Construction and maintenance of guards.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14112(a)(1) · $151.00 proposed penalty
Electrical conductors.
Stavola Construction Materials, Inc. · 280001530 CFR 56.12004 · Significant and substantial (S&S) · $151.00 proposed penalty
Trimming stockpile and muckpile faces.
Stavola Construction Materials, Inc. · 280001530 CFR 56.9314 · Significant and substantial (S&S) · $959.00 proposed penalty
Electrical conductors.
Stavola Construction Materials, Inc. · 280001530 CFR 56.12004 · $151.00 proposed penalty
Electrical conductors.
Stavola Construction Materials, Inc. · 280001530 CFR 56.12004 · $151.00 proposed penalty
Electrical conductors.
Stavola Construction Materials, Inc. · 280001530 CFR 56.12004 · $151.00 proposed penalty
Construction and maintenance of guards.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14112(a)(1) · Significant and substantial (S&S) · $432.00 proposed penalty
Safety defects; examination, correction and records.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14100(c) · Significant and substantial (S&S) · $193.00 proposed penalty
Construction and maintenance of guards.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14112(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14112(a)(1) · $151.00 proposed penalty
Construction and maintenance of guards.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14112(a)(1) · $151.00 proposed penalty
Horns and backup alarms.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14132(a) · $151.00 proposed penalty
Housekeeping.
Stavola Construction Materials, Inc. · 280001530 CFR 56.20003(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14112(a)(1) · $151.00 proposed penalty
Construction and maintenance of guards.
Stavola Construction Materials, Inc. · 280001530 CFR 56.14112(a)(1) · $151.00 proposed penalty
Combustible waste.
Stavola Construction Materials, Inc. · 280001530 CFR 56.4104(b) · $151.00 proposed penalty
Violation — cited standard not reported
Stavola Construction Materials, Inc. · 2800015Pit or quarry wall perimeter.
Stavola Construction Materials, Inc. · 280001530 CFR 56.3131 · $151.00 proposed penalty
Regular Safety and Health Inspection
Stavola Construction Materials, Inc. · 280001566.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.