Signal Peak Energy LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Temporary notations, revisions, and supplements.
Bull Mountains Mine No 1 · 240195030 CFR 75.1202 · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Bull Mountains Mine No 1 · 240195030 CFR 75.1909(e) · $226.00 proposed penalty
Methane monitors.
Bull Mountains Mine No 1 · 240195030 CFR 75.342(a)(4) · $209.00 proposed penalty
Ventilation controls.
Bull Mountains Mine No 1 · 240195030 CFR 75.333(d)(3) · $226.00 proposed penalty
Accumulation of combustible materials.
Bull Mountains Mine No 1 · 240195030 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Bull Mountains Mine No 1 · 240195030 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Bull Mountains Mine No 1 · 240195030 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Bull Mountains Mine No 1 · 240195030 CFR 75.400 · $366.00 proposed penalty
High-voltage circuits; circuit breakers.
Bull Mountains Mine No 1 · 240195030 CFR 75.800 · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Bull Mountains Mine No 1 · 240195030 CFR 75.1909(c)(3) · $226.00 proposed penalty
Handtools (nonpowered)
Bull Mountains Mine No 1 · 2401950Days away from work only
Accident narrative
While splicing cable, helper moved cable causing knife to slip and causing laceration to right top of hand, between thumb and index finger. Required four stitches with follow up with Ortho specialist.
Atmospheric monitoring systems.
Bull Mountains Mine No 1 · 240195030 CFR 75.351(q)(2) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bull Mountains Mine No 1 · 240195030 CFR 75.1731(a) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Bull Mountains Mine No 1 · 240195030 CFR 75.1909(e) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Bull Mountains Mine No 1 · 240195030 CFR 75.1909(d) · $366.00 proposed penalty
Regular Safety and Health Inspection
Bull Mountains Mine No 1 · 2401950286.5 on-site hours reported
Hazard training.
Bull Mountains Mine No 1 · 240195030 CFR 48.31(d) · $151.00 proposed penalty
Requirement for container labels.
Bull Mountains Mine No 1 · 240195030 CFR 47.41(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Bull Mountains Mine No 1 · 240195030 CFR 75.400 · $288.00 proposed penalty
Accumulations of combustible materials.
Bull Mountains Mine No 1 · 240195030 CFR 77.1104 · $226.00 proposed penalty
Escapeways; bituminous and lignite mines.
Bull Mountains Mine No 1 · 240195030 CFR 75.380(d)(1) · $6,037.00 proposed penalty
Accumulation of combustible materials.
Bull Mountains Mine No 1 · 240195030 CFR 75.400 · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bull Mountains Mine No 1 · 240195030 CFR 75.1731(a) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Bull Mountains Mine No 1 · 240195030 CFR 75.1909(c)(5) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Bull Mountains Mine No 1 · 240195030 CFR 75.380(d)(7)(iv) · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.