Shelly Materials Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Reedsville Pit · 330443330.3 on-site hours reported
Fall of roof or back
Fultonham Plant · 3300042Accident only
Accident narrative
A roof fall occurred in L3/C88 due to water and poor roof geology in this area. The area was barricaded immediately.
Non-Injury Accident Investigation
Fultonham Plant · 33000427.0 on-site hours reported
Violation — cited standard not reported
Fultonham Plant · 3300042Regular Safety and Health Inspection
St Louisville Plant · 330147118.0 on-site hours reported
Warning signs.
St Louisville Plant · 330147130 CFR 56.4101 · $151.00 proposed penalty
Parking procedures for unattended equipment.
St Louisville Plant · 330147130 CFR 56.14207 · $151.00 proposed penalty
Correction of dangerous conditions.
St Louisville Plant · 330147130 CFR 56.12030 · $193.00 proposed penalty
Berms or guardrails.
Fultonham Plant · 330004230 CFR 57.9300(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Inspection.
Fultonham Plant · 330004230 CFR 57.4201(b) · $151.00 proposed penalty
Impoundment Spot Inspection
Shelly Material Inc. Ostrander · 33001685.3 on-site hours reported
Safety defects; examination, correction and records.
Fultonham Plant · 330004230 CFR 57.14100(c) · $151.00 proposed penalty
Construction and maintenance of guards.
Marble Cliff Quarry · 330009730 CFR 57.14112(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
Fultonham Plant · 330004257.3 on-site hours reported
Regular Safety and Health Inspection
Marble Cliff Quarry · 330009728.0 on-site hours reported
Correction of hazardous conditions.
Marble Cliff Quarry · 330009730 CFR 57.3200 · $267.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts for surface equipment.
Marble Cliff Quarry · 330009730 CFR 57.14130(g) · Significant and substantial (S&S) · $592.00 proposed penalty
General requirements.
Marble Cliff Quarry · 330009730 CFR 57.4200(b)(2) · $151.00 proposed penalty
Handrails and toeboards.
Marble Cliff Quarry · 330009730 CFR 57.11002 · $151.00 proposed penalty
Handrails and toeboards.
Marble Cliff Quarry · 330009730 CFR 57.11002 · $151.00 proposed penalty
Housekeeping.
Marble Cliff Quarry · 330009730 CFR 57.20003(a) · $151.00 proposed penalty
Housekeeping.
Marble Cliff Quarry · 330009730 CFR 57.20003(a) · $151.00 proposed penalty
Housekeeping.
Marble Cliff Quarry · 330009730 CFR 57.20003(a) · $151.00 proposed penalty
Grounding circuit enclosures.
Marble Cliff Quarry · 330009730 CFR 57.12025 · $151.00 proposed penalty
Requirement for container labels.
Marble Cliff Quarry · 330009730 CFR 47.41(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.