← Sally Ann Coal Company Inc

Sally Ann Coal Company Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Deluge-type water spray systems.

    violationRecord 5099220
    No 1 · 4607366

    30 CFR 75.1101-1(b) · $151.00 proposed penalty

  2. Deluge-type water spray systems.

    violationRecord 5099219
    No 1 · 4607366

    30 CFR 75.1101-1(a) · $151.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5099218
    No 1 · 4607366

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  4. Roof control plan.

    violationRecord 5098405
    No 1 · 4607366

    30 CFR 75.220(a)(1) · $1,431.00 proposed penalty

  5. Other safeguards.

    violationRecord 5098404
    No 1 · 4607366

    30 CFR 75.1403 · $151.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 5098403
    No 1 · 4607366

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  7. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5098402
    No 1 · 4607366

    30 CFR 75.1106-3(a)(2) · $288.00 proposed penalty

  8. Temporary notations, revisions, and supplements.

    violationRecord 5090021
    No 1 · 4607366

    30 CFR 75.1202-1(a) · $151.00 proposed penalty

  9. Permissible electric face equipment; maintenance.

    violationRecord 5098401
    No 1 · 4607366

    30 CFR 75.503 · $226.00 proposed penalty

  10. Quantity and location of firefighting equipment.

    violationRecord 5098400
    No 1 · 4607366

    30 CFR 75.1100-2(f) · $226.00 proposed penalty

  11. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5090199
    No 1 · 4607366

    30 CFR 75.701 · $755.00 proposed penalty

  12. Electric equipment; examination, testing and maintenance.

    violationRecord 5090198
    No 1 · 4607366

    30 CFR 75.512 · $1,550.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5090197
    No 1 · 4607366

    30 CFR 75.370(a)(1) · $3,736.00 proposed penalty

  14. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5090196
    No 1 · 4607366

    30 CFR 75.701 · $336.00 proposed penalty

  15. Condition and examination of firefighting equipment.

    violationRecord 5090195
    No 1 · 4607366

    30 CFR 75.1100-3 · $151.00 proposed penalty

  16. Cable fittings; suitability.

    violationRecord 5090194
    No 1 · 4607366

    30 CFR 75.515 · $151.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5090193
    No 1 · 4607366

    30 CFR 75.512 · $1,550.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5090192
    No 1 · 4607366

    30 CFR 75.202(a) · Significant and substantial (S&S) · $336.00 proposed penalty

  19. Cable fittings; suitability.

    violationRecord 5090191
    No 1 · 4607366

    30 CFR 75.515 · $151.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5090190
    No 1 · 4607366

    30 CFR 75.400 · $465.00 proposed penalty

  21. Electric equipment; examination, testing and maintenance.

    violationRecord 5090189
    No 1 · 4607366

    30 CFR 75.512 · $151.00 proposed penalty

  22. Power wires and cables; insulation and protection.

    violationRecord 5090188
    No 1 · 4607366

    30 CFR 75.517 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  23. Machinery and equipment; operation and maintenance.

    violationRecord 5090187
    No 1 · 4607366

    30 CFR 75.1725(a) · $592.00 proposed penalty

  24. Cable fittings; suitability.

    violationRecord 5090186
    No 1 · 4607366

    30 CFR 77.505 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  25. Installation of main mine fans.

    violationRecord 5090184
    No 1 · 4607366

    30 CFR 75.310(a)(4) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.