103 (g) Written Notification Hazard Complaint Inspectio
PIT 12 · 42020781.0 on-site hours reported
Spot Inspection
PIT 12 · 42020787.3 on-site hours reported
Construction and maintenance of ladders.
PIT 12 · 420207830 CFR 56.11003 · $209.00 proposed penalty
Moving machine parts.
PIT 12 · 420207830 CFR 56.14107(a) · $313.00 proposed penalty
Construction and maintenance of guards.
PIT 12 · 420207830 CFR 56.14112(a)(1) · $313.00 proposed penalty
Moving machine parts.
PIT 12 · 420207830 CFR 56.14107(a) · $313.00 proposed penalty
Safety defects; examination, correction and records.
PIT 12 · 420207830 CFR 56.14100(b) · $3,022.00 proposed penalty
Inspection and cover plates.
PIT 12 · 420207830 CFR 56.12032 · $313.00 proposed penalty
Construction and maintenance of guards.
PIT 12 · 420207830 CFR 56.14112(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Records of training.
PIT 12 · 420207830 CFR 46.9 · $151.00 proposed penalty
Records of training.
PIT 12 · 420207830 CFR 46.9 · $151.00 proposed penalty
Records of training.
PIT 12 · 420207830 CFR 46.9 · $151.00 proposed penalty
Operators stations.
PIT 12 · 420207830 CFR 56.14103(a) · $313.00 proposed penalty
Insulation and fittings for power wires and cables.
PIT 12 · 420207830 CFR 56.12008 · $313.00 proposed penalty
Requirement for container labels.
PIT 12 · 420207830 CFR 47.41(a)(1) · $209.00 proposed penalty
Berms or guardrails.
PIT 12 · 420207830 CFR 56.9300(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty
Regular Safety and Health Inspection
PIT 12 · 420207810.8 on-site hours reported
Inspection and cover plates.
PIT 12 · 420207830 CFR 56.12032 · $313.00 proposed penalty
Protection for openings around travelways.
PIT 12 · 420207830 CFR 56.11012 · $697.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
PIT 12 · 420207830 CFR 56.14130(c) · $151.00 proposed penalty
Parking procedures for unattended equipment.
PIT 12 · 420207830 CFR 56.14207 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Regular Safety and Health Inspection
PIT 12 · 420207817.0 on-site hours reported
Construction and maintenance of guards.
PIT 12 · 420207830 CFR 56.14112(a)(1) · $313.00 proposed penalty
Inspection and cover plates.
PIT 12 · 420207830 CFR 56.12032 · $313.00 proposed penalty
Horns and backup alarms.
PIT 12 · 420207830 CFR 56.14132(a) · $697.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.