ROSEBUD MINING COMPANY safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
On-shift examination.
CASSELMAN MINE · 180078030 CFR 75.362(g)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
CASSELMAN MINE · 180078030 CFR 75.400 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Accumulation of combustible materials.
CASSELMAN MINE · 180078030 CFR 75.400 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
MC VILLE PREP PLANT · 360889730 CFR 77.1713(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
MC VILLE PREP PLANT · 360889730 CFR 77.502 · $177.00 proposed penalty
Loading and haulage equipment; installations.
MC VILLE PREP PLANT · 360889730 CFR 77.1605(c) · Significant and substantial (S&S) · $883.00 proposed penalty
Protective clothing; requirements.
MC VILLE PREP PLANT · 360889730 CFR 77.1710(h) · Significant and substantial (S&S) · $398.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection.
KOCJANCIC · 360943630 CFR 75.518 · $151.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
ACOSTA DEEP MINE · 360989330 CFR 75.1714-4(b) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
CROOKED CREEK MINE · 360997230 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty
Spot Inspections
HEILWOOD · 3609407103(i) · 7.0 on-site hours reported
Regular Safety and Health Inspection
MINE 78 PREPARATION PLANT · 360952541.8 on-site hours reported
Spot Inspections
CROOKED CREEK MINE · 3609972103(i) · 6.0 on-site hours reported
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
CHERRY TREE MINE · 360922430 CFR 75.1714-3(a) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
CRESSON · 360930830 CFR 75.202(a) · $151.00 proposed penalty
Temporary notations, revisions, and supplements.
HEILWOOD · 360940730 CFR 75.1202-1(b)(4) · $151.00 proposed penalty
Spot Inspections
KNOB CREEK · 3609394103(i) · 6.0 on-site hours reported
Roof Control Technical Investigation
ACOSTA DEEP MINE · 36098936.0 on-site hours reported
Permissible electric face equipment; maintenance.
CASSELMAN MINE · 180078030 CFR 75.503 · $177.00 proposed penalty
Installation of high-voltage transmission cables.
CASSELMAN MINE · 180078030 CFR 75.807 · $313.00 proposed penalty
Mechanical equipment guards.
CASSELMAN MINE · 180078030 CFR 75.1722(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Protection from falls of roof, face and ribs.
PARKWOOD MINE · 360878530 CFR 75.202(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Mine ventilation plan; submission and approval.
PARKWOOD MINE · 360878530 CFR 75.370(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
CROOKED CREEK MINE · 360997230 CFR 75.512 · $151.00 proposed penalty
Ventilation controls.
CASSELMAN MINE · 180078030 CFR 75.333(d)(1) · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.