Rogers Group Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
CLAIBORNE COUNTY QUARRY · 40025659.5 on-site hours reported
Regular Safety and Health Inspection
Canton Quarry · 150001419.0 on-site hours reported
Regular Safety and Health Inspection
Rhea County Stone · 400008212.0 on-site hours reported
Regular Safety and Health Inspection
Caryville Quarry · 400289924.3 on-site hours reported
Regular Safety and Health Inspection
Flatrock Quarry · 44000819.8 on-site hours reported
Safe access.
Flatrock Quarry · 440008130 CFR 56.11001 · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
Oldham County Stone · 151484919.0 on-site hours reported
Safety defects; examination, correction and records.
Boone Quarry · 151806830 CFR 57.14100(b) · $151.00 proposed penalty
Handtools (nonpowered)
Lawrenceburg Quarry & Mill · 4001250No dys awy frm wrk,no rstr act
Accident narrative
A set up crew employee was attempting to remove liners from a cone crusher, by striking the liners with a 10 lb sledgehammer. During this process, a shard of the manganese liner chipped off and went into the employee's left forearm. The employee was taken to the emergency room where the shard was extracted, wound was cleaned, and 5 stitches were administered.
Regular Safety and Health Inspection
Cord Quarry · 03018707.0 on-site hours reported
Electrical conductors.
Boone Quarry · 151806830 CFR 57.12004 · $151.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Boone Quarry · 151806830 CFR 57.14109(b)(1) · $151.00 proposed penalty
Flying or falling materials.
Boone Quarry · 151806830 CFR 57.14110 · $151.00 proposed penalty
Safe access.
Boone Quarry · 151806830 CFR 57.11001 · $151.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Boone Quarry · 151806830 CFR 57.14109(b)(1) · $151.00 proposed penalty
Moving machine parts.
Boone Quarry · 151806830 CFR 57.14107(a) · $151.00 proposed penalty
Moving machine parts.
Boone Quarry · 151806830 CFR 57.14107(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Regular Safety and Health Inspection
Cabot Quarry · 03015049.8 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Cabot Quarry · 030150430 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Cabot Quarry · 030150430 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Cabot Quarry · 030150430 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Cabot Quarry · 030150430 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Cabot Quarry · 030150430 CFR 50.30(a) · $151.00 proposed penalty
Annual refresher training.
Cabot Quarry · 030150430 CFR 46.8(a)(2) · $168.00 proposed penalty
Parking procedures for unattended equipment.
Cabot Quarry · 030150430 CFR 56.14207 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.