Rogers Group Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Non-Fatal Accident Investigation
Jefferson County Stone · 15181579.0 on-site hours reported
Main fan maintenance.
Boone Quarry · 151806830 CFR 57.8525 · $151.00 proposed penalty
Flying or falling materials.
Boone Quarry · 151806830 CFR 57.14110 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Combustible waste.
Boone Quarry · 151806830 CFR 57.4104(b)(1) · $313.00 proposed penalty
Construction and maintenance of guards.
Rutherford Quarry · 400006130 CFR 56.14112(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
Greenbrier Quarry · 03008559.5 on-site hours reported
Regular Safety and Health Inspection
Rutherford Quarry · 400006131.0 on-site hours reported
Requirement for container labels.
Greenbrier Quarry · 030085530 CFR 47.41(a) · $151.00 proposed penalty
Housekeeping.
Greenbrier Quarry · 030085530 CFR 56.20003(a) · $151.00 proposed penalty
Fall of roof or back
Jefferson County Stone · 1518157No dys awy frm wrk,no rstr act
Accident narrative
Employee had bolted the face up tight then backed out roughly 50', was reloading bolt supplies when a piece of material fell from in between the roof bolts. It struck the cab and broke over the side striking the employee who was on foot next to the cab/engine bay checking the water level. Employee received laceration to their head and leg which were closed at the hospital ER.
Protection for openings around travelways.
Boone Quarry · 151806830 CFR 57.11012 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Suspended loads.
Boone Quarry · 151806830 CFR 57.16009 · $151.00 proposed penalty
Suspended loads.
Boone Quarry · 151806830 CFR 57.16009 · $151.00 proposed penalty
Examination of working places.
Boone Quarry · 151806830 CFR 57.18002(a) · $398.00 proposed penalty
Regular Safety and Health Inspection
Boone Quarry · 151806853.0 on-site hours reported
Combustible waste.
Boone Quarry · 151806830 CFR 57.4104(b)(1) · $398.00 proposed penalty
Safety belts and lines.
Boone Quarry · 151806830 CFR 57.15005 · Significant and substantial (S&S) · $883.00 proposed penalty
Horns and backup alarms for surface equipment.
Boone Quarry · 151806830 CFR 57.14132(b)(1)(i) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Boone Quarry · 151806830 CFR 57.14207 · $398.00 proposed penalty
Horns and backup alarms for surface equipment.
Boone Quarry · 151806830 CFR 57.14132(b)(1)(i) · $151.00 proposed penalty
Slip or fall of person
Canton Quarry · 1500014No dys awy frm wrk,no rstr act
Accident narrative
Employee was dismounting portable metso jaw crucher ladder to go to the other ladder on the metso and tripped. The employee scraped their left forearm which required 6 stitches.
Machinery, equipment, and tools.
Ennis Sand & Gravel · 410541230 CFR 56.14205 · $151.00 proposed penalty
Brakes.
Ennis Sand & Gravel · 410541230 CFR 56.14101(a)(2) · $177.00 proposed penalty
Regular Safety and Health Inspection
Ennis Sand & Gravel · 410541210.0 on-site hours reported
Regular Safety and Health Inspection
Caldwell Stone · 150000919.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.