ROCKWELL MINING, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Verbal Hazard Complaint Inspections
WELLS PREP PLANT AND LOADOUT · 46052952.5 on-site hours reported
Verbal Hazard Complaint Inspections
Flying Eagle · 460947112.0 on-site hours reported
Condition and examination of firefighting equipment.
Flying Eagle · 460947130 CFR 75.1100-3 · $245.00 proposed penalty
Escapeway maps.
Flying Eagle · 460947130 CFR 75.1505(a)(3) · $1,431.00 proposed penalty
Preshift examination at fixed intervals.
Flying Eagle · 460947130 CFR 75.360(f) · $151.00 proposed penalty
Condition and examination of firefighting equipment.
Flying Eagle · 460947130 CFR 75.1100-3 · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Escapeways; bituminous and lignite mines.
Flying Eagle · 460947130 CFR 75.380(d)(7)(iii) · $1,431.00 proposed penalty
Regular Safety and Health Inspection
WELLS PREP PLANT AND LOADOUT · 460529547.5 on-site hours reported
Machinery and equipment; operation and maintenance.
Rocklick Preparation Plant · 460644830 CFR 77.404(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Mobile equipment; automatic warning devices.
Glancy Surface Mine · 460937730 CFR 77.410(b) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Glancy Surface Mine · 460937730 CFR 77.404(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Glancy Surface Mine · 460937730 CFR 77.1110 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Glancy Surface Mine · 460937730 CFR 77.404(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
EAGLE #3 MINE · 460942730 CFR 77.1606(c) · $177.00 proposed penalty
Mobile equipment; automatic warning devices.
EAGLE #3 MINE · 460942730 CFR 77.410(c) · $209.00 proposed penalty
Maintenance of incombustible content of rock dust.
EAGLE #3 MINE · 460942730 CFR 75.403 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
EAGLE #3 MINE · 460942730 CFR 77.404(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
EAGLE #3 MINE · 460942730 CFR 77.1606(c) · $151.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
Flying Eagle · 460947130 CFR 75.363(a) · $151.00 proposed penalty
Communications facilities; refuge alternatives.
EAGLE #3 MINE · 460942730 CFR 75.1600-3(a)(1) · $151.00 proposed penalty
Roof control plan.
EAGLE #3 MINE · 460942730 CFR 75.220(a)(1) · $151.00 proposed penalty
Other safeguards.
EAGLE #3 MINE · 460942730 CFR 75.1403 · $165.00 proposed penalty
Condition and examination of firefighting equipment.
EAGLE #3 MINE · 460942730 CFR 75.1100-3 · $818.00 proposed penalty
Roof control plan.
EAGLE #3 MINE · 460942730 CFR 75.220(a)(1) · $165.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.