ROCKWELL MINING, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
EAGLE #3 MINE · 460942730 CFR 75.1731(a) · $432.00 proposed penalty
Accumulation of combustible materials.
EAGLE #3 MINE · 460942730 CFR 75.400 · $226.00 proposed penalty
Preshift examination at fixed intervals.
EAGLE #3 MINE · 460942730 CFR 75.360(g) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $549.00 proposed penalty
Dust accumulations in surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.202 · $1,219.00 proposed penalty
Escapeways; bituminous and lignite mines.
EAGLE #3 MINE · 460942730 CFR 75.380(d)(7)(vii) · $151.00 proposed penalty
Roof control plan.
EAGLE #3 MINE · 460942730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Flying Eagle · 460947130 CFR 75.512 · $245.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(b) · $7,676.00 proposed penalty
Openings in surface installations; safeguards.
Rocklick Preparation Plant · 460644830 CFR 77.204 · $398.00 proposed penalty
Surface installations; general.
Rocklick Preparation Plant · 460644830 CFR 77.200 · $4,749.00 proposed penalty
Surface installations; general.
Rocklick Preparation Plant · 460644830 CFR 77.200 · $4,749.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(e) · $398.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $642.00 proposed penalty
Quantity and location of firefighting equipment.
Flying Eagle · 460947130 CFR 75.1100-2(b) · $288.00 proposed penalty
Violation — cited standard not reported
Flying Eagle · 4609471$320.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $4,047.00 proposed penalty
Escapeways; bituminous and lignite mines.
Flying Eagle · 460947130 CFR 75.380(d)(7)(vii) · $288.00 proposed penalty
Mine ventilation plan; contents.
Flying Eagle · 460947130 CFR 75.371(l) · $288.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Identification of circuit breakers and disconnecting switches.
Flying Eagle · 460947130 CFR 75.809 · $151.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(e) · $398.00 proposed penalty
Special Emphasis Programs
WELLS PREP PLANT AND LOADOUT · 46052950.5 on-site hours reported
Impoundment Spot Inspection
WELLS PREP PLANT AND LOADOUT · 46052953.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.