← ROCKWELL MINING, LLC

ROCKWELL MINING, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Violation — cited standard not reported

    violationRecord 5095420
    Flying Eagle · 4609471

    $714.00 proposed penalty

  2. Quarterly sampling; mechanized mining units.

    violationRecord 5025150
    COAL BRANCH NO. 2 · 4609663

    30 CFR 70.208(a)(2) · $226.00 proposed penalty

  3. Quarterly sampling; mechanized mining units.

    violationRecord 5025149
    COAL BRANCH NO. 2 · 4609663

    30 CFR 70.208(a)(2) · $226.00 proposed penalty

  4. Roof control plan.

    violationRecord 9838194
    Flying Eagle · 4609471

    30 CFR 75.220(a)(1) · $959.00 proposed penalty

  5. Examination and maintenance of firefighting equipment.

    violationRecord 9838193
    Flying Eagle · 4609471

    30 CFR 77.1110 · $398.00 proposed penalty

  6. Roof control plan.

    violationRecord 9554295
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  7. Violation — cited standard not reported

    violationRecord 9554294
    COAL BRANCH NO. 2 · 4609663
  8. Non-Injury Accident Investigation

    inspectionRecord 6322874
    COAL BRANCH NO. 2 · 4609663

    11.0 on-site hours reported

  9. Spot Inspection

    inspectionRecord 6321892
    Rocklick Preparation Plant · 4606448

    2.0 on-site hours reported

  10. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 9840124
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.601-1 · $151.00 proposed penalty

  11. Roof control plan.

    violationRecord 9840123
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.220(a)(1) · $226.00 proposed penalty

  12. Impoundment Spot Inspection

    inspectionRecord F01401C
    Rocklick Preparation Plant · 4606448

    2.5 on-site hours reported

  13. Loading and haulage equipment; installations.

    violationRecord 5025373
    Glancy Surface Mine · 4609377

    30 CFR 77.1605(d) · $465.00 proposed penalty

  14. Stripping; loose material.

    violationRecord 5025372
    Glancy Surface Mine · 4609377

    30 CFR 77.1001 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  15. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022605
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  16. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022604
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  17. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022603
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022602
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  19. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022601
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  20. Loading and haulage equipment; operation.

    violationRecord 5025371
    Glancy Surface Mine · 4609377

    30 CFR 77.1607(i) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  21. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9839990
    Glancy Surface Mine · 4609377

    30 CFR 77.1606(c) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  22. Protective clothing; requirements.

    violationRecord 9840122
    COAL BRANCH NO. 2 · 4609663

    30 CFR 77.1710(g) · Significant and substantial (S&S) · $3,022.00 proposed penalty

  23. Roof control plan.

    violationRecord 5024310
    EAGLE #3 MINE · 4609427

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  24. Methane monitors.

    violationRecord 5024309
    EAGLE #3 MINE · 4609427

    30 CFR 75.342(a)(4) · $432.00 proposed penalty

  25. Installation of high-voltage transmission cables.

    violationRecord 5024308
    EAGLE #3 MINE · 4609427

    30 CFR 75.807 · $883.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.