ROCKWELL MINING, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty
On-shift examination.
Flying Eagle · 460947130 CFR 75.362(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Water sprinkler systems; arrangement of sprinklers.
Flying Eagle · 460947130 CFR 75.1101-8(a) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(a) · $398.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · $366.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(a) · $398.00 proposed penalty
Ventilation controls.
Flying Eagle · 460947130 CFR 75.333(h) · $151.00 proposed penalty
Ventilation controls.
Flying Eagle · 460947130 CFR 75.333(c)(2) · $245.00 proposed penalty
Verbal Hazard Complaint Inspections
EAGLE #3 MINE · 46094276.0 on-site hours reported
Verbal Hazard Complaint Inspections
Flying Eagle · 46094715.0 on-site hours reported
Hazard training.
Rocklick Preparation Plant · 460644830 CFR 48.31(d) · $313.00 proposed penalty
Storage of materials.
Rocklick Preparation Plant · 460644830 CFR 77.208(d) · $313.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Flying Eagle · 460947130 CFR 75.512 · $193.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $313.00 proposed penalty
Methane monitors.
Flying Eagle · 460947130 CFR 75.342(a)(4) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Flying Eagle · 460947130 CFR 75.512 · $193.00 proposed penalty
Dust disease of lungs
Flying Eagle · 4609471Occupatnal illness not deg 1-6
Accident narrative
10% pulmonary function impairment.
Dust disease of lungs
COAL BRANCH NO. 2 · 4609663Occupatnal illness not deg 1-6
Accident narrative
10% pulmonary function impairment
Loading and haulage equipment; inspection and maintenance.
Rocklick Preparation Plant · 460644830 CFR 77.1606(c) · $755.00 proposed penalty
Mechanical equipment guards.
Rocklick Preparation Plant · 460644830 CFR 77.400(d) · $1,550.00 proposed penalty
Regular Safety and Health Inspection
Rocklick Preparation Plant · 4606448112.0 on-site hours reported
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.