RiverBend Materials safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Parking procedures for unattended equipment.
East Valley · 450374430 CFR 56.14207 · $4,047.00 proposed penalty
Handling of materials
RiverBend Materials Corvallis · 3502705Dys awy frm wrk & restrctd act
Accident narrative
While attempting to clear rock from underneath the conveyer, the employee slipped and caught themselves by grabbing onto the conveyer guard. The abrupt motion caused their torso to twist resulting in lower back/abdominal pain.
Regular Safety and Health Inspection
East Valley · 45037447.3 on-site hours reported
Regular Safety and Health Inspection
RiverBend Materials Coburg · 35010645.8 on-site hours reported
Electrical conductors.
RiverBend Materials Coburg · 350106430 CFR 56.12004 · $193.00 proposed penalty
Regular Safety and Health Inspection
RiverBend Materials North Pit · 35004844.3 on-site hours reported
Regular Safety and Health Inspection
Portable Screening Plant · 35033114.0 on-site hours reported
Examination of working places.
Allied Rock Portable Crusher #1 · 350368830 CFR 56.18002(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Allied Rock Portable Crusher #1 · 35036883.0 on-site hours reported
Regular Safety and Health Inspection
RiverBend Materials RiverBend West · 35035964.5 on-site hours reported
Regular Safety and Health Inspection
Portable Plant · 35037825.3 on-site hours reported
Regular Safety and Health Inspection
UMPQUA SAND & GRAVEL PIT · 35005935.5 on-site hours reported
Construction and maintenance of guards.
RiverBend Materials Corvallis · 350270530 CFR 56.14112(b) · $151.00 proposed penalty
Construction and maintenance of guards.
RiverBend Materials Corvallis · 350270530 CFR 56.14112(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
RiverBend Materials Corvallis · 35027053.8 on-site hours reported
Warnings prior to starting or moving equipment.
Sullivan Road Facility · 450270930 CFR 56.14200 · $151.00 proposed penalty
Regular Safety and Health Inspection
Sullivan Road Facility · 45027094.3 on-site hours reported
Regular Safety and Health Inspection
RiverBend Materials Dalton · 35006313.5 on-site hours reported
Regular Safety and Health Inspection
Wilbur Division · 35038444.8 on-site hours reported
Housekeeping.
RiverBend Materials Dalton · 350063130 CFR 56.20003(a) · $151.00 proposed penalty
Horns and backup alarms.
Wilbur Division · 350384430 CFR 56.14132(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
RiverBend Materials Windsor · 35034258.5 on-site hours reported
Impoundment Spot Inspection
Auburn Facility · 45012372.3 on-site hours reported
Powered haulage
RiverBend Materials North Pit · 3500484Days restricted activity only
Accident narrative
Running loader, feeding plant bouncing in loader repeatedly. Sought treatment for claim on 3/28.
Regular Safety and Health Inspection
Allied Rock Portable Crusher #2 · 35037753.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.