River Cement Company dba Buzzi Unicem USA safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Verbal Hazard Complaint Inspections
Selma Plant Quarry & Mill · 23001883.0 on-site hours reported
Correction of dangerous conditions.
Selma Plant Quarry & Mill · 230018830 CFR 56.12030 · $209.00 proposed penalty
Machinery
Selma Plant Quarry & Mill · 2300188No dys awy frm wrk,no rstr act
Accident narrative
Employee was using a grinder throughout their work shift. Around 3:30PM they notified site safety coordinator about irritation in their right eye.
Slip or fall of person
Selma Plant Quarry & Mill · 2300188No dys awy frm wrk,no rstr act
Accident narrative
EE was walking towards EE's office when EE tripped on a rug causing EE to fall forward landing on both knees. EE then noticed blood seeping through EE's jeans at the right knee. Upon inspecting knee, EE noticed a laceration measuring about 4 inches in length across EE's right knee. EE went to Mercy Jefferson ER where EE received 12 stitches to close the wound.
Impoundment Spot Inspection
Selma Plant Quarry & Mill · 23001882.0 on-site hours reported
Safety belts and lines.
Selma Plant Quarry & Mill · 230018830 CFR 56.15005 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Construction and maintenance of guards.
Selma Plant Quarry & Mill · 230018830 CFR 56.14112(b) · $151.00 proposed penalty
Eye protection.
Selma Plant Quarry & Mill · 230018830 CFR 56.15004 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Selma Plant Quarry & Mill · 230018830 CFR 56.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Selma Plant Quarry & Mill · 230018830 CFR 56.14100(b) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Selma Plant Quarry & Mill · 230018830 CFR 56.12008 · $151.00 proposed penalty
Installation of transformers.
Selma Plant Quarry & Mill · 230018830 CFR 56.12067 · $1,126.00 proposed penalty
Combustible waste.
Selma Plant Quarry & Mill · 230018830 CFR 56.4104 · $151.00 proposed penalty
Parking procedures for unattended equipment.
Selma Plant Quarry & Mill · 230018830 CFR 56.14207 · $151.00 proposed penalty
Safe access.
Selma Plant Quarry & Mill · 230018830 CFR 56.11001 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Safety defects; examination, correction and records.
Selma Plant Quarry & Mill · 230018830 CFR 56.14100(b) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Selma Plant Quarry & Mill · 230018830 CFR 56.14207 · $151.00 proposed penalty
Protection of power conductors from mobile equipment.
Selma Plant Quarry & Mill · 230018830 CFR 56.12005 · $151.00 proposed penalty
Safe access.
Selma Plant Quarry & Mill · 230018830 CFR 56.11001 · Significant and substantial (S&S) · $755.00 proposed penalty
Horns and backup alarms.
Selma Plant Quarry & Mill · 230018830 CFR 56.14132(a) · $151.00 proposed penalty
Housekeeping.
Selma Plant Quarry & Mill · 230018830 CFR 56.20003(a) · $151.00 proposed penalty
Safe access.
Selma Plant Quarry & Mill · 230018830 CFR 56.11001 · $151.00 proposed penalty
Distribution boxes.
Selma Plant Quarry & Mill · 230018830 CFR 56.12006 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Berms or guardrails.
Selma Plant Quarry & Mill · 230018830 CFR 56.9300(a) · $432.00 proposed penalty
Regular Safety and Health Inspection
Selma Plant Quarry & Mill · 2300188102.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.