Quikrete Construction Materials, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.20003(c) · $366.00 proposed penalty
Electrical conductors.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.12004 · $3,736.00 proposed penalty
Safe access.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.11001 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Inspection.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.4201(a)(1) · $366.00 proposed penalty
Housekeeping.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.20003(c) · $366.00 proposed penalty
Horns and backup alarms.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.14132(a) · $1,219.00 proposed penalty
Regular Safety and Health Inspection
HARLEYVILLE MINE & PLANT · 380030584.0 on-site hours reported
Inspection and cover plates.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.12032 · $1,431.00 proposed penalty
Construction and maintenance of guards.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.14112(a)(1) · $697.00 proposed penalty
Inspection and cover plates.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.12032 · $4,749.00 proposed penalty
Illumination of surface working areas.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.17001 · $465.00 proposed penalty
Electrical conductors.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.12004 · $1,550.00 proposed penalty
Construction and maintenance of guards.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.14112(a)(1) · $465.00 proposed penalty
Electrical conductors.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.12004 · $1,550.00 proposed penalty
Berms or guardrails.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.9300(b) · $465.00 proposed penalty
Electrical conductors.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.12004 · $1,550.00 proposed penalty
Housekeeping.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.20003(a) · $1,968.00 proposed penalty
Construction and maintenance of guards.
HARLEYVILLE MINE & PLANT · 380030530 CFR 56.14112(b) · $2,936.00 proposed penalty
Compliance Follow-up Inspection
ARGOS ROBERTA PLANT · 01006292.0 on-site hours reported
Heat sources.
Newberry Cement Plant · 080127730 CFR 56.4500 · $549.00 proposed penalty
High-pressure hose connections.
Newberry Cement Plant · 080127730 CFR 56.13021 · $165.00 proposed penalty
Air receiver tanks.
Newberry Cement Plant · 080127730 CFR 56.13011 · $165.00 proposed penalty
Protection of gas cylinder valves.
Newberry Cement Plant · 080127730 CFR 56.16006 · $165.00 proposed penalty
Brakes.
Newberry Cement Plant · 080127730 CFR 56.14101(a)(2) · $165.00 proposed penalty
Warning signs.
Newberry Cement Plant · 080127730 CFR 56.4101 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.