← POCAHONTAS COAL COMPANY LLC

POCAHONTAS COAL COMPANY LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5021653
    AFFINITY MINE · 4608878

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5021651
    AFFINITY MINE · 4608878

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $15,768.00 proposed penalty

  3. Roof control plan.

    violationRecord 5095132
    AFFINITY MINE · 4608878

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $549.00 proposed penalty

  4. Spot Inspections

    inspectionRecord F00C0A1
    AFFINITY MINE · 4608878

    103(i) · 7.0 on-site hours reported

  5. Mine ventilation plan; submission and approval.

    violationRecord 5025211
    AFFINITY MINE · 4608878

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  6. Permissible electric face equipment; maintenance.

    violationRecord 5025210
    AFFINITY MINE · 4608878

    30 CFR 75.503 · $313.00 proposed penalty

  7. Respirable dust standards.

    violationRecord 5021649
    AFFINITY MINE · 4608878

    30 CFR 70.100(a)(2) · Significant and substantial (S&S) · $504.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5095127
    AFFINITY MINE · 4608878

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  9. Ventilation controls.

    violationRecord 5095126
    AFFINITY MINE · 4608878

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5020122
    AFFINITY MINE · 4608878

    30 CFR 75.503 · $151.00 proposed penalty

  11. Mining methods.

    violationRecord 5020121
    AFFINITY MINE · 4608878

    30 CFR 75.203(b) · $226.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5095125
    AFFINITY MINE · 4608878

    30 CFR 75.1731(a) · $151.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F020A61
    AFFINITY MINE · 4608878

    103(i) · 8.0 on-site hours reported

  14. Spot Inspection

    inspectionRecord 6322438
    Affinity Preparation Plant · 4608879

    1.5 on-site hours reported

  15. Mine ventilation plan; submission and approval.

    violationRecord 5099334
    AFFINITY MINE · 4608878

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5095124
    AFFINITY MINE · 4608878

    30 CFR 75.400 · $151.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5095123
    AFFINITY MINE · 4608878

    30 CFR 75.400 · $151.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F01AAB4
    AFFINITY MINE · 4608878

    103(i) · 6.5 on-site hours reported

  19. Disorders (repeated trauma)

    accidentRecord 220260560010
    AFFINITY MINE · 4608878

    Occupatnal illness not deg 1-6

    Accident narrative

    On 2-19-2026, during routine work activity, the employee experienced an acute onset of pain while making a standard movement (handling fly pads). No unusual event, accident, or hazardous condition was identified. The condition is the result of cumulative repetitive physical stress, with symptoms becoming acute on the reported date.

  20. Handling of materials

    accidentRecord 220260560006
    AFFINITY MINE · 4608878

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was at the block hole on 1C belt between the track and scoop road. The employee was hand loading block when EE struck EE's left pinky finger between the corner of the scoop bucket and the block in EE's hand. it was approx 5'6'' high and damp in the area. the employee received 5 sutures and pain medication.

  21. Maintenance of incombustible content of rock dust.

    violationRecord 5095122
    AFFINITY MINE · 4608878

    30 CFR 75.403 · $226.00 proposed penalty

  22. Maintenance of incombustible content of rock dust.

    violationRecord 5095121
    AFFINITY MINE · 4608878

    30 CFR 75.403 · Significant and substantial (S&S) · $14,557.00 proposed penalty

  23. Maintenance of incombustible content of rock dust.

    violationRecord 5095120
    AFFINITY MINE · 4608878

    30 CFR 75.403 · $226.00 proposed penalty

  24. Maintenance of incombustible content of rock dust.

    violationRecord 5095119
    AFFINITY MINE · 4608878

    30 CFR 75.403 · $151.00 proposed penalty

  25. Maintenance of incombustible content of rock dust.

    violationRecord 5095118
    AFFINITY MINE · 4608878

    30 CFR 75.403 · Significant and substantial (S&S) · $3,448.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.