Electrical conductors.
Landisville Quarry · 360007430 CFR 56.12004 · $151.00 proposed penalty
Housekeeping.
Landisville Quarry · 360007430 CFR 56.20003(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
SMALL MOUNTAIN QUARRY INC · 360803330 CFR 56.14100(b) · $697.00 proposed penalty
Regular Safety and Health Inspection
SMALL MOUNTAIN QUARRY INC · 360803310.5 on-site hours reported
Moving machine parts.
SMALL MOUNTAIN QUARRY INC · 360803330 CFR 56.14107(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Abandoned electric circuits.
SMALL MOUNTAIN QUARRY INC · 360803330 CFR 56.4011 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Machinery, equipment, and tools.
SMALL MOUNTAIN QUARRY INC · 360803330 CFR 56.14205 · $209.00 proposed penalty
Correction of hazardous conditions.
SMALL MOUNTAIN QUARRY INC · 360803330 CFR 56.3200 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Retaining dams.
East Petersburg Quarry · 360002330 CFR 56.20010 · $592.00 proposed penalty
Housekeeping.
East Petersburg Quarry · 360002330 CFR 56.20003(a) · $209.00 proposed penalty
New miner training.
East Petersburg Quarry · 360002330 CFR 46.5(b) · $233.00 proposed penalty
Correction of hazardous conditions.
East Petersburg Quarry · 360002330 CFR 56.3200 · $177.00 proposed penalty
Safety defects; examination, correction and records.
PRESCOTT QUARRY · 360003930 CFR 56.14100(b) · $151.00 proposed penalty
Moving machine parts.
PRESCOTT QUARRY · 360003930 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
East Petersburg Quarry · 360002328.5 on-site hours reported
Regular Safety and Health Inspection
PRESCOTT QUARRY · 360003917.0 on-site hours reported
Safe access.
PRESCOTT QUARRY · 360003930 CFR 56.11001 · $151.00 proposed penalty
Handling of materials
Silver Springs Quarry · 3600212Days away from work only
Accident narrative
EE was attempting to rotate a rotor shaft manually to grease the bearing housing. EE placed EE's hands on the belt to move the shaft and when EE pulled EE's pinky finger was pulled into the motor sheave causing a laceration and a fracture to EE's pinky finger.
Regular Safety and Health Inspection
Millard Quarry · 360905820.8 on-site hours reported
Verbal Hazard Complaint Inspections
East Petersburg Quarry · 36000232.0 on-site hours reported
Regular Safety and Health Inspection
SMALL MOUNTAIN QUARRY INC · 360803311.5 on-site hours reported
Traffic control.
SMALL MOUNTAIN QUARRY INC · 360803330 CFR 56.9100 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Safety defects; examination, correction and records.
SMALL MOUNTAIN QUARRY INC · 360803330 CFR 56.14100(b) · $209.00 proposed penalty
Access to stationary electrical equipment or switchgear.
SMALL MOUNTAIN QUARRY INC · 360803330 CFR 56.12019 · $209.00 proposed penalty
Housekeeping.
Thomasville Mine · 360343230 CFR 57.20003(a) · Significant and substantial (S&S) · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.