Peabody Southeast Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection from falls of roof, face and ribs.
Shoal Creek Mine · 010290130 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Ventilation controls.
Shoal Creek Mine · 010290130 CFR 75.333(h) · $366.00 proposed penalty
Condition and examination of firefighting equipment.
Shoal Creek Mine · 010290130 CFR 75.1100-3 · $151.00 proposed penalty
Spot Inspections
Shoal Creek Mine · 0102901103(i) · 8.8 on-site hours reported
Accumulation of combustible materials.
Shoal Creek Mine · 010290130 CFR 75.400 · $642.00 proposed penalty
Protection from falls of roof, face and ribs.
Shoal Creek Mine · 010290130 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Ventilation controls.
Shoal Creek Mine · 010290130 CFR 75.333(c)(3) · $313.00 proposed penalty
Slip or fall of person
Shoal Creek Mine · 0102901Days away from work only
Accident narrative
IW was shoveling belts and slipped. IE threw their shoulder backwards with shovel in it to catch themselves. When IE threw shoulder back, they heard a pop. IE was taken in for evaluation and when results came back, they suffered a rotator cuff tear on right shoulder.IE continued to work until 07/22/2025 and then went out for surgery.
Accumulation of combustible materials.
Shoal Creek Mine · 010290130 CFR 75.400 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Escapeways; bituminous and lignite mines.
Shoal Creek Mine · 010290130 CFR 75.380(d)(7)(vi) · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Shoal Creek Mine · 010290130 CFR 75.1731(b) · $398.00 proposed penalty
Accumulation of combustible materials.
Shoal Creek Mine · 010290130 CFR 75.400 · $642.00 proposed penalty
Machinery
Shoal Creek Mine · 0102901Days away from work only
Accident narrative
IE was cutting bottom and slowly trammed miner to the right. The miner cable loop rolled up and struck IE in the back of left knee. IE continued to work until 08/15/2025 where the MRI showed they had a slight tear in their meniscus. IE chose to have surgery to repair.
Accumulation of combustible materials.
Shoal Creek Mine · 010290130 CFR 75.400 · $642.00 proposed penalty
Ventilation controls.
Shoal Creek Mine · 010290130 CFR 75.333(h) · $366.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
Shoal Creek Mine · 010290130 CFR 75.1002(a) · $313.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
Shoal Creek Mine · 010290130 CFR 75.1002(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Shoal Creek Mine · 010290130 CFR 75.1731(a) · $313.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Shoal Creek Mine · 010290130 CFR 75.1731(b) · $398.00 proposed penalty
Spot Inspections
Shoal Creek Mine · 0102901103(i) · 5.5 on-site hours reported
Verbal Hazard Complaint Inspections
Shoal Creek Mine · 01029011.0 on-site hours reported
First-aid equipment; location; minimum requirements.
Shoal Creek Mine · 010290130 CFR 75.1713-7(a)(3) · $313.00 proposed penalty
Spot Inspections
Shoal Creek Mine · 0102901103(i) · 4.5 on-site hours reported
Regular Safety and Health Inspection
Shoal Creek Mine · 0102901629.0 on-site hours reported
Spot Inspections
Shoal Creek Mine · 0102901103(i) · 4.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.