Peabody Midwest Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection from falls of roof, face and ribs.
Francisco Underground Pit · 120229530 CFR 75.202(a)
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1)
Ventilation controls.
Francisco Underground Pit · 120229530 CFR 75.333(h)
Roof bolting.
Francisco Underground Pit · 120229530 CFR 75.204(c)(1)
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1)
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.8 on-site hours reported
Methane monitors.
Francisco Underground Pit · 120229530 CFR 75.342(a)(4) · Significant and substantial (S&S)
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · Significant and substantial (S&S)
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1)
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400
Protection from falls of roof, face and ribs.
Francisco Underground Pit · 120229530 CFR 75.202(a)
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.8 on-site hours reported
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · Significant and substantial (S&S)
Machinery and equipment; operation and maintenance.
Francisco Underground Pit · 120229530 CFR 75.1725(a)
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400
Impoundment Spot Inspection
Preparation Plant · 110254625.0 on-site hours reported
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.3 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; general.
Preparation Plant · 110254630 CFR 77.216(d)
Water, sediment, or slurry impoundments and impounding structures; general.
Preparation Plant · 110254630 CFR 77.216(d)
Water, sediment, or slurry impoundments and impounding structures; general.
Preparation Plant · 110254630 CFR 77.216(d)
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400
Impoundment Spot Inspection
Francisco Mine · 12021475.0 on-site hours reported
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 7.3 on-site hours reported
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.