Peabody Midwest Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $336.00 proposed penalty
Installation of high-voltage transmission cables.
Francisco Underground Pit · 120229530 CFR 75.807 · $592.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.8 on-site hours reported
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Stationary grinding machines; protective devices.
Francisco Underground Pit · 120229530 CFR 77.401(a)(2) · $177.00 proposed penalty
Regular Safety and Health Inspection
Francisco Underground Pit · 1202295558.0 on-site hours reported
Mechanical equipment guards.
Francisco Underground Pit · 120229530 CFR 75.1722(c) · $267.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 4.5 on-site hours reported
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.5 on-site hours reported
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $336.00 proposed penalty
Preshift examination at fixed intervals.
Francisco Underground Pit · 120229530 CFR 75.360(b)(3) · Significant and substantial (S&S) · $11,450.00 proposed penalty
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 9.0 on-site hours reported
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Francisco Underground Pit · 120229530 CFR 75.202(a) · $177.00 proposed penalty
Power wires and cables; insulation and protection.
Francisco Underground Pit · 120229530 CFR 75.517 · $592.00 proposed penalty
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $313.00 proposed penalty
Maintenance of incombustible content of rock dust.
Francisco Underground Pit · 120229530 CFR 75.403 · $226.00 proposed penalty
Drill dust control at underground areas of underground mines.
Francisco Underground Pit · 120229530 CFR 72.630(b) · Significant and substantial (S&S) · $642.00 proposed penalty
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · $151.00 proposed penalty
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · $209.00 proposed penalty
Quarterly sampling; designated areas.
Francisco Underground Pit · 120229530 CFR 70.209(a) · $151.00 proposed penalty
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.