Peabody Midwest Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of incombustible content of rock dust.
Francisco Underground Pit · 120229530 CFR 75.403 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · $177.00 proposed penalty
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $177.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Francisco Underground Pit · 120229530 CFR 75.1909(c)(4) · $177.00 proposed penalty
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $465.00 proposed penalty
Permissible electric face equipment; maintenance.
Francisco Underground Pit · 120229530 CFR 75.503 · Significant and substantial (S&S) · $592.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 7.0 on-site hours reported
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $1,219.00 proposed penalty
Impoundment Spot Inspection
Preparation Plant · 11025466.0 on-site hours reported
Machinery and equipment; operation and maintenance.
Francisco Underground Pit · 120229530 CFR 75.1725(a) · $177.00 proposed penalty
Permissible electric face equipment; maintenance.
Francisco Underground Pit · 120229530 CFR 75.503 · $245.00 proposed penalty
Methane monitors.
Francisco Underground Pit · 120229530 CFR 75.342(a)(4) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Francisco Underground Pit · 120229530 CFR 75.503 · $245.00 proposed penalty
Machinery and equipment; operation and maintenance.
Francisco Underground Pit · 120229530 CFR 77.404(a) · $177.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 7.3 on-site hours reported
Supplemental examination.
Francisco Underground Pit · 120229530 CFR 75.361(b) · $366.00 proposed penalty
Maintenance of diesel-powered equipment.
Francisco Underground Pit · 120229530 CFR 75.1914(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 5.5 on-site hours reported
Health Technical Investigation
Francisco Underground Pit · 12022957.0 on-site hours reported
On-shift examination.
Francisco Underground Pit · 120229530 CFR 75.362(a)(2) · $883.00 proposed penalty
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Preshift examination at fixed intervals.
Francisco Underground Pit · 120229530 CFR 75.360(b)(3) · $642.00 proposed penalty
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · $313.00 proposed penalty
Ventilation controls.
Francisco Underground Pit · 120229530 CFR 75.333(h) · $177.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.