Peabody Midwest Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $549.00 proposed penalty
Spot Inspection
Francisco Underground Pit · 12022956.3 on-site hours reported
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.0 on-site hours reported
Mine ventilation plan; submission and approval.
Francisco Underground Pit · 120229530 CFR 75.370(a)(1) · $959.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 7.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
Francisco Underground Pit · 120229530 CFR 75.1731(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $504.00 proposed penalty
Permissible electric face equipment; maintenance.
Francisco Underground Pit · 120229530 CFR 75.503 · Significant and substantial (S&S) · $755.00 proposed penalty
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $504.00 proposed penalty
Automatic emergency-parking brakes.
Francisco Underground Pit · 120229530 CFR 75.523-3(b)(4) · $226.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.3 on-site hours reported
Impoundment Spot Inspection
Francisco Mine · 12021472.5 on-site hours reported
Nonpermissible diesel-powered equipment; design and performance requirements.
Francisco Underground Pit · 120229530 CFR 75.1909(d) · $883.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Francisco Underground Pit · 120229530 CFR 75.1909(b)(4) · $226.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.5 on-site hours reported
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · $336.00 proposed penalty
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · $151.00 proposed penalty
Warning devices.
Francisco Underground Pit · 120229530 CFR 75.208 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Spot Inspection
Columbia Maintenance Services · 12020761.5 on-site hours reported
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Francisco Underground Pit · 120229530 CFR 75.1731(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Accumulation of combustible materials.
Francisco Underground Pit · 120229530 CFR 75.400 · $465.00 proposed penalty
Spot Inspections
Francisco Underground Pit · 1202295103(i) · 6.0 on-site hours reported
Roof control plan.
Francisco Underground Pit · 120229530 CFR 75.220(a)(1) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Francisco Underground Pit · 120229530 CFR 75.1909(a)(2) · $465.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.