Peabody Gateway North Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Gateway North Mine · 110323530 CFR 75.370(a)(1) · $313.00 proposed penalty
Regular Safety and Health Inspection
Gateway North Mine · 1103235396.3 on-site hours reported
Spot Inspections
Gateway North Mine · 1103235103(i) · 6.8 on-site hours reported
Methane monitors.
Gateway North Mine · 110323530 CFR 75.342(a)(4) · $151.00 proposed penalty
Spot Inspections
Gateway North Mine · 1103235103(i) · 6.5 on-site hours reported
Fire suppression systems for diesel-powered equipment and fuel transportation units.
Gateway North Mine · 110323530 CFR 75.1911(i) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
Gateway North Mine · 110323530 CFR 75.1910(j) · $226.00 proposed penalty
Roof control plan.
Gateway North Mine · 110323530 CFR 75.220(a)(1) · $432.00 proposed penalty
Mechanical equipment guards.
Gateway North Mine · 110323530 CFR 75.1722(c) · $755.00 proposed penalty
Accumulation of combustible materials.
Gateway North Mine · 110323530 CFR 75.400 · $504.00 proposed penalty
Automatic emergency-parking brakes.
Gateway North Mine · 110323530 CFR 75.523-3(b)(5) · $226.00 proposed penalty
Roof control plan.
Gateway North Mine · 110323530 CFR 75.220(a)(1) · $432.00 proposed penalty
Automatic emergency-parking brakes.
Gateway North Mine · 110323530 CFR 75.523-3(b)(5) · $226.00 proposed penalty
Roof control plan.
Gateway North Mine · 110323530 CFR 75.220(a)(1) · $432.00 proposed penalty
Escapeways; bituminous and lignite mines.
Gateway North Mine · 110323530 CFR 75.380(d)(4)(ii) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
Gateway North Mine · 110323530 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Protection from falls of roof, face and ribs.
Gateway North Mine · 110323530 CFR 75.202(a) · $366.00 proposed penalty
Accumulation of combustible materials.
Gateway North Mine · 110323530 CFR 75.400 · $504.00 proposed penalty
Mine ventilation plan; submission and approval.
Gateway North Mine · 110323530 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Accumulation of combustible materials.
Gateway North Mine · 110323530 CFR 75.400 · $504.00 proposed penalty
Spot Inspections
Gateway North Mine · 1103235103(i) · 14.0 on-site hours reported
Dry chemical devices; capacity; minimum requirements.
Gateway North Mine · 110323530 CFR 75.1107-9(a)(2) · $226.00 proposed penalty
Accumulation of combustible materials.
Gateway North Mine · 110323530 CFR 75.400 · $504.00 proposed penalty
Warning devices.
Gateway North Mine · 110323530 CFR 75.208 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Protection from falls of roof, face and ribs.
Gateway North Mine · 110323530 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.