Electric equipment; examination, testing and maintenance.
Deer Run Mine · 110318230 CFR 75.512 · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Deer Run Mine · 110318230 CFR 75.512 · $193.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 7.5 on-site hours reported
Other
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE stepped from one side of the bolter to the other and the left knee popped while checking the torque on the roof bolts.
Spot Inspections
Deer Run Mine · 1103182103(i) · 4.0 on-site hours reported
Handling of materials
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE was strapping down materials on the tool sled when a piece of pipe rolled off the top of the sled and smashed the right thumb causing a fracture.
Handling of materials
Deer Run Mine · 1103182No dys awy frm wrk,no rstr act
Accident narrative
IE was assisting another miner with removing the drill rig operator's platform so they could change the drill bit. The IE got a finger pinched between two pieces of chain, resulting in a laceration that required 4 stiches to close up
Ventilation controls.
Deer Run Mine · 110318230 CFR 75.333(e)(1)(i) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 4.8 on-site hours reported
Fall of roof or back
Deer Run Mine · 1103182Accident only
Accident narrative
An unplanned roof fall occurred in entry #3 in the intersection of 79 in HG 8.
Non-Injury Accident Investigation
Deer Run Mine · 110318211.8 on-site hours reported
Violation — cited standard not reported
Deer Run Mine · 1103182Spot Inspections
Deer Run Mine · 1103182103(i) · 7.0 on-site hours reported
Mine ventilation plan; submission and approval.
Deer Run Mine · 110318230 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Mine ventilation plan; submission and approval.
Deer Run Mine · 110318230 CFR 75.370(a)(1) · $288.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 6.5 on-site hours reported
Operation of diesel-powered equipment.
Deer Run Mine · 110318230 CFR 75.1916(d) · $193.00 proposed penalty
Mechanical equipment guards.
Deer Run Mine · 110318230 CFR 75.1722(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Handling of materials
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE was dropping tubes when the tube bounced off of the ground jamming EE's finger causing a fracture.
Spot Inspections
Deer Run Mine · 1103182103(i) · 4.0 on-site hours reported
Regular Safety and Health Inspection
Deer Run Mine · 1103182162.8 on-site hours reported
Spot Inspections
Deer Run Mine · 1103182103(i) · 7.0 on-site hours reported
Spot Inspection
Deer Run Mine · 11031827.0 on-site hours reported
Spot Inspections
Deer Run Mine · 1103182103(i) · 5.0 on-site hours reported
Spot Inspections
Deer Run Mine · 1103182103(i) · 5.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.