Installation of high-voltage transmission cables.
Deer Run Mine · 110318230 CFR 75.807 · $642.00 proposed penalty
Power wires and cables; insulation and protection.
Deer Run Mine · 110318230 CFR 75.517 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Permissible electric face equipment; maintenance.
Deer Run Mine · 110318230 CFR 75.503 · $288.00 proposed penalty
Accumulation of combustible materials.
Deer Run Mine · 110318230 CFR 75.400 · $313.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Deer Run Mine · 110318230 CFR 75.512 · $193.00 proposed penalty
Installation of high-voltage transmission cables.
Deer Run Mine · 110318230 CFR 75.807 · $642.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 8.0 on-site hours reported
Protection from falls of roof, face and ribs.
Deer Run Mine · 110318230 CFR 75.202(a) · $193.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Deer Run Mine · 110318230 CFR 75.1731(b) · $193.00 proposed penalty
Handling of materials
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE was moving oil cans to a pallet when EE pulled a muscle in EE's back.
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403 · $151.00 proposed penalty
Electrical
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE was unplugging a VFD power cable when an arc flash occurred.
Non-Fatal Accident Investigation
Deer Run Mine · 110318215.5 on-site hours reported
Violation — cited standard not reported
Deer Run Mine · 1103182Installation of high-voltage transmission cables.
Deer Run Mine · 110318230 CFR 75.807 · $642.00 proposed penalty
Cable fittings; suitability.
Deer Run Mine · 110318230 CFR 75.515 · $642.00 proposed penalty
Testing, examination and maintenance.
Deer Run Mine · 110318230 CFR 75.821(a) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
Deer Run Mine · 110318230 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Accumulation of combustible materials.
Deer Run Mine · 110318230 CFR 75.400 · $313.00 proposed penalty
Mechanical equipment guards.
Deer Run Mine · 110318230 CFR 75.1722(a) · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403 · $151.00 proposed penalty
Handling of materials
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE had EE's finger smashed between 2 wooden gluts causing a fracture on EE's ring finger.
Water, sediment, or slurry impoundments and impounding structures; general.
Deer Run Mine · 110318230 CFR 77.216(d) · $2,712.00 proposed penalty
Other
Deer Run Mine · 1103182Days away from work only
Accident narrative
Employee was walking down stairs. Felt a pop in their left knee.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.