← Patton Mining LLC

Patton Mining LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5015497
    Deer Run Mine · 1103182

    30 CFR 75.400 · $336.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5015496
    Deer Run Mine · 1103182

    30 CFR 75.400 · $336.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F00B6CA
    Deer Run Mine · 1103182

    103(i) · 5.0 on-site hours reported

  4. Warning devices.

    violationRecord 5015495
    Deer Run Mine · 1103182

    30 CFR 75.208 · $193.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5015494
    Deer Run Mine · 1103182

    30 CFR 75.202(a) · $193.00 proposed penalty

  6. Power wires and cables; insulation and protection.

    violationRecord 5015493
    Deer Run Mine · 1103182

    30 CFR 75.517 · $226.00 proposed penalty

  7. Protection of trailing cables.

    violationRecord 5015492
    Deer Run Mine · 1103182

    30 CFR 75.606 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5015491
    Deer Run Mine · 1103182

    30 CFR 75.400 · $336.00 proposed penalty

  9. Protection of trailing cables.

    violationRecord 5015490
    Deer Run Mine · 1103182

    30 CFR 75.606 · $193.00 proposed penalty

  10. Roof control plan.

    violationRecord 5015489
    Deer Run Mine · 1103182

    30 CFR 75.220(a)(1) · $193.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 5015267
    Deer Run Mine · 1103182

    30 CFR 75.517 · $755.00 proposed penalty

  12. Electric equipment; examination, testing and maintenance.

    violationRecord 5015266
    Deer Run Mine · 1103182

    30 CFR 75.512 · $193.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F00B6C9
    Deer Run Mine · 1103182

    103(i) · 7.5 on-site hours reported

  14. Other safeguards.

    violationRecord 9780669
    Deer Run Mine · 1103182

    30 CFR 75.1403

  15. Protective clothing; requirements.

    violationRecord 9106922
    Deer Run Mine · 1103182

    30 CFR 77.1710(h) · $642.00 proposed penalty

  16. Maintenance of diesel-powered equipment.

    violationRecord 5015488
    Deer Run Mine · 1103182

    30 CFR 75.1914(a) · $209.00 proposed penalty

  17. Violation — cited standard not reported

    violationRecord 5015487
    Deer Run Mine · 1103182

    $642.00 proposed penalty

  18. Protective clothing; requirements.

    violationRecord 9780664
    Deer Run Mine · 1103182

    30 CFR 75.1720(c) · Significant and substantial (S&S) · $26,139.00 proposed penalty

  19. Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.

    violationRecord 9780663
    Deer Run Mine · 1103182

    30 CFR 48.7(c) · Significant and substantial (S&S) · $33,227.00 proposed penalty

  20. Breaking trailing cable and power cable connections.

    violationRecord 9780662
    Deer Run Mine · 1103182

    30 CFR 75.607 · Significant and substantial (S&S) · $26,139.00 proposed penalty

  21. Low-, medium-, or high-voltage distribution circuits and equipment; repair.

    violationRecord 9780661
    Deer Run Mine · 1103182

    30 CFR 75.511 · Significant and substantial (S&S) · $90,649.00 proposed penalty

  22. Investigation.

    violationRecord 9780668
    Deer Run Mine · 1103182

    30 CFR 50.11(b) · $432.00 proposed penalty

  23. Immediate notification.

    violationRecord 9780667
    Deer Run Mine · 1103182

    30 CFR 50.10(d) · $2,133.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9780666
    Deer Run Mine · 1103182

    30 CFR 75.1731(a) · $151.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 9780665
    Deer Run Mine · 1103182

    30 CFR 75.400 · Significant and substantial (S&S) · $8,529.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.