Patton Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof control plan.
Deer Run Mine · 110318230 CFR 75.220(a)(1) · Significant and substantial (S&S)
Spot Inspections
Deer Run Mine · 1103182103(i) · 6.8 on-site hours reported
Methane monitors.
Deer Run Mine · 110318230 CFR 75.342(a)(4) · $151.00 proposed penalty
Handling of materials
Deer Run Mine · 1103182No dys awy frm wrk,no rstr act
Accident narrative
IE was adjusting straps on the ventilation tubes when the tubes fell and hit EE's hand causing a laceration. IE received 3 sutures.
Drill dust control at underground areas of underground mines.
Deer Run Mine · 110318230 CFR 72.630(b) · $288.00 proposed penalty
Maintenance of diesel-powered equipment.
Deer Run Mine · 110318230 CFR 75.1914(a) · $193.00 proposed penalty
Handling of materials
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE was in the high line tube recovering high line cable when the cable got wrapped around their foot. When the IE tried to get their foot out they heard a pop. X rays showed a small fracture in their foot.
Accumulation of combustible materials.
Deer Run Mine · 110318230 CFR 75.400 · $336.00 proposed penalty
Verbal Hazard Complaint Inspections
Deer Run Mine · 11031824.3 on-site hours reported
Proximity detection systems.
Deer Run Mine · 110318230 CFR 75.1732(d)(3) · $2,133.00 proposed penalty
Proximity detection systems.
Deer Run Mine · 110318230 CFR 75.1732(d)(1) · $432.00 proposed penalty
Preservation of evidence.
Deer Run Mine · 110318230 CFR 50.12 · $177.00 proposed penalty
Proximity detection systems.
Deer Run Mine · 110318230 CFR 75.1732(a) · Significant and substantial (S&S) · $90,649.00 proposed penalty
Roof control plan.
Deer Run Mine · 110318230 CFR 75.220(a)(1) · Significant and substantial (S&S) · $72,092.00 proposed penalty
Accumulation of combustible materials.
Deer Run Mine · 110318230 CFR 75.400 · $336.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Deer Run Mine · 110318230 CFR 75.1714-3(d) · Significant and substantial (S&S) · $45,760.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Deer Run Mine · 110318230 CFR 75.1714-3(a) · Significant and substantial (S&S) · $45,760.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 6.3 on-site hours reported
Accumulation of combustible materials.
Deer Run Mine · 110318230 CFR 75.400 · $336.00 proposed penalty
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403
Spot Inspections
Deer Run Mine · 1103182103(i) · 4.0 on-site hours reported
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
Deer Run Mine · 110318230 CFR 75.1910(j) · $193.00 proposed penalty
Inspection of fire suppression devices.
Deer Run Mine · 110318230 CFR 75.1107-16(b) · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.