  1. Mine ventilation plan; submission and approval.

    violationRecord 8303505
    DEEP MINE 41 · 4407223

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $883.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 8303504
    DEEP MINE 41 · 4407223

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  3. Smoking; prohibition.

    violationRecord 8303503
    DEEP MINE 41 · 4407223

    30 CFR 75.1702 · $165.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 8281025
    DEEP MINE 41 · 4407223

    30 CFR 75.400 · $267.00 proposed penalty

  5. Examination and maintenance of firefighting equipment.

    violationRecord 8281024
    DEEP MINE 41 · 4407223

    30 CFR 77.1110 · $165.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 8281023
    DEEP MINE 41 · 4407223

    30 CFR 75.400 · $267.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F014939
    DEEP MINE 41 · 4407223

    103(i) · 6.0 on-site hours reported

  8. Accumulation of combustible materials.

    violationRecord 9880331
    DEEP MINE 41 · 4407223

    30 CFR 75.400 · $267.00 proposed penalty

  9. Power wires and cables; insulation and protection.

    violationRecord 9272722
    DEEP MINE 41 · 4407223

    30 CFR 75.517 · $165.00 proposed penalty

  10. Fire suppression devices; approved components; installation requirements.

    violationRecord 9272721
    DEEP MINE 41 · 4407223

    30 CFR 75.1107-3(d) · $165.00 proposed penalty

  11. Condition and examination of firefighting equipment.

    violationRecord 9272720
    DEEP MINE 41 · 4407223

    30 CFR 75.1100-3 · $165.00 proposed penalty

  12. Handling of materials

    accidentRecord 220252370007
    DEEP MINE 41 · 4407223

    Days away from work only

    Accident narrative

    Employee loaded roof straps onto scoop. Once loaded EE took gloves off to steps them down. EE grabbed wire to tie down straps and EE's left hand slipped back causing EE to hit hand and pinky finger which resulted in a laceration to EE's pinky finger.

  13. Spot Inspections

    inspectionRecord F014937
    DEEP MINE 41 · 4407223

    103(i) · 6.5 on-site hours reported

  14. Accumulation of combustible materials.

    violationRecord 9880330
    DEEP MINE 41 · 4407223

    30 CFR 75.400 · $151.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 9880329
    DEEP MINE 41 · 4407223

    30 CFR 75.400 · $267.00 proposed penalty

  16. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 8281022
    DEEP MINE 41 · 4407223

    30 CFR 75.1731(b) · $151.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F014936
    DEEP MINE 41 · 4407223

    103(i) · 5.5 on-site hours reported

  18. Mine ventilation plan; submission and approval.

    violationRecord 9880300
    DEEP MINE 41 · 4407223

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 9880299
    DEEP MINE 41 · 4407223

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 8303501
    DEEP MINE 41 · 4407223

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 8303500
    DEEP MINE 41 · 4407223

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  22. Drill dust control at underground areas of underground mines.

    violationRecord 8281021
    DEEP MINE 41 · 4407223

    30 CFR 72.630(b) · $151.00 proposed penalty

  23. Electric equipment; examination, testing and maintenance.

    violationRecord 8281020
    DEEP MINE 41 · 4407223

    30 CFR 75.512 · $151.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 8281019
    DEEP MINE 41 · 4407223

    30 CFR 75.202(a) · Significant and substantial (S&S) · $818.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 8281018
    DEEP MINE 41 · 4407223

    30 CFR 75.512 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.