Paramont Contura, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
DEEP MINE 41 · 440722330 CFR 75.1731(a) · $193.00 proposed penalty
Accumulation of combustible materials.
DEEP MINE 41 · 440722330 CFR 75.400 · $366.00 proposed penalty
Handling of materials
DEEP MINE 41 · 4407223No dys awy frm wrk,no rstr act
Accident narrative
Employee was attempting to slide the forks together on the forklift when EE lost EE's footing causing EE to mash EE's left index finger and middle finger resulting in a fracture and lacerations. 3 sutures in EE's index finger and 2 in EE's middle finger.
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 3.0 on-site hours reported
Powered haulage
DEEP MINE 41 · 4407223Days away from work only
Accident narrative
Employee was in the process of loosening a hydraulic hose on a low trac on the 004 MMU. While loosening the hose the pallet forks leaked off squeezing EE's head against the tilt arm of the low trac and the low trac frame. This resulted in 6 stitches.
Examination and maintenance of firefighting equipment.
TOMS CREEK COMPLEX · 440527030 CFR 77.1110 · $151.00 proposed penalty
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 3.5 on-site hours reported
Loading and haulage equipment; operation.
TOMS CREEK COMPLEX · 440527030 CFR 77.1607(cc) · Significant and substantial (S&S) · $177.00 proposed penalty
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 2.5 on-site hours reported
Quantity and location of firefighting equipment.
TOMS CREEK COMPLEX · 440527030 CFR 77.1109(c)(1) · $151.00 proposed penalty
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 3.0 on-site hours reported
Mechanical equipment guards.
TOMS CREEK COMPLEX · 440527030 CFR 77.400(d) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
DEEP MINE 41 · 440722330 CFR 75.380(d)(7)(vii)(A) · $193.00 proposed penalty
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 6.0 on-site hours reported
Examination and maintenance of firefighting equipment.
TOMS CREEK COMPLEX · 440527030 CFR 77.1110 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
DEEP MINE 41 · 440722330 CFR 75.370(a)(1) · $288.00 proposed penalty
Quarterly sampling; mechanized mining units.
DEEP MINE 41 · 440722330 CFR 70.208(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
DEEP MINE 41 · 440722330 CFR 75.370(a)(1) · $151.00 proposed penalty
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 4.5 on-site hours reported
Other safeguards.
DEEP MINE 41 · 440722330 CFR 75.1403
Protective clothing; requirements.
DEEP MINE 41 · 440722330 CFR 75.1720(d) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection; minimum requirements.
TOMS CREEK COMPLEX · 440527030 CFR 77.506-1 · $151.00 proposed penalty
Regular Safety and Health Inspection
DEEP MINE 46 · 4407433102.0 on-site hours reported
Regular Safety and Health Inspection
DEEP MINE 41 · 4407223590.0 on-site hours reported
Loading and haulage equipment; installations.
TOMS CREEK COMPLEX · 440527030 CFR 77.1605(k) · Significant and substantial (S&S) · $883.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.