← P&K Stone, LLC

P&K Stone, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F0126E5
    Chico 1 · 4105110

    10.3 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F028DB9
    Coleman Quarry · 3402246

    5.3 on-site hours reported

  3. Requirement for container labels.

    violationRecord 5003823
    Coleman Quarry · 3402246

    30 CFR 47.41(a) · $151.00 proposed penalty

  4. Compliance Follow-up Inspection

    inspectionRecord F012FAD
    Chico 1 · 4105110

    0.5 on-site hours reported

  5. Permissible exposure level.

    violationRecord 9798200
    Chico 1 · 4105110

    30 CFR 62.130(a) · $504.00 proposed penalty

  6. General instructions for completing MSHA Form 7000-1.

    violationRecord 9798199
    Chico 1 · 4105110

    30 CFR 50.20-1 · $151.00 proposed penalty

  7. Dump site restraints.

    violationRecord 9798198
    Chico 1 · 4105110

    30 CFR 56.9301 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  8. Stairstep clearance.

    violationRecord 9798197
    Chico 1 · 4105110

    30 CFR 56.11010 · $313.00 proposed penalty

  9. Barricades and warning signs.

    violationRecord 9798196
    Chico 1 · 4105110

    30 CFR 56.20011 · $209.00 proposed penalty

  10. Horns and backup alarms.

    violationRecord 9798195
    Chico 1 · 4105110

    30 CFR 56.14132(b)(1)(i) · $465.00 proposed penalty

  11. Brakes.

    violationRecord 9798194
    Chico 1 · 4105110

    30 CFR 56.14101(a)(2) · $313.00 proposed penalty

  12. Permissible exposure level.

    violationRecord 5003001
    Chico 1 · 4105110

    30 CFR 62.130(a) · $504.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord 6938894
    Chico 1 · 4105110

    21.0 on-site hours reported

  14. Safety defects; examination, correction and records.

    violationRecord 9798193
    Chico 1 · 4105110

    30 CFR 56.14100(b) · $313.00 proposed penalty

  15. Safe access.

    violationRecord 9798192
    Chico 1 · 4105110

    30 CFR 56.11001 · $313.00 proposed penalty

  16. Combustible waste.

    violationRecord 9798191
    Chico 1 · 4105110

    30 CFR 56.4104(b) · $151.00 proposed penalty

  17. Slip or fall of person

    accidentRecord 220250620012
    Chico 1 · 4105110

    Dys awy frm wrk & restrctd act

    Accident narrative

    EE Slipped of access latter of WA500 loader as EE was dismounting falling 4 1/2 feet to ground. EE sustained tear to ACL and fracture to fibula to right leg.

  18. Regular Safety and Health Inspection

    inspectionRecord F017634
    Chico 2 Quarry · 4104827

    11.8 on-site hours reported

  19. Requirement for container labels.

    violationRecord 9798232
    Chico 2 Quarry · 4104827

    30 CFR 47.41(a) · $151.00 proposed penalty

  20. Handtools (nonpowered)

    accidentRecord 220250160013
    Mill Creek Quarry · 3402207

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was cutting a tube of grease with utility knife and cut the tip of left thumb.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.