P&K Stone, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Identification of power switches.
Mill Creek Quarry · 340220730 CFR 56.12018 · $313.00 proposed penalty
Inspection.
Mill Creek Quarry · 340220730 CFR 56.4201(a)(1) · $313.00 proposed penalty
Requirement for container labels.
Mill Creek Quarry · 340220730 CFR 47.41(a) · $313.00 proposed penalty
Combustible waste.
Mill Creek Quarry · 340220730 CFR 56.4104(b) · $313.00 proposed penalty
Berms or guardrails.
Mill Creek Quarry · 340220730 CFR 56.9300(a) · $1,037.00 proposed penalty
Safety defects; examination, correction and records.
Mill Creek Quarry · 340220730 CFR 56.14100(b) · $313.00 proposed penalty
Safety defects; examination, correction and records.
Mill Creek Quarry · 340220730 CFR 56.14100(b) · $313.00 proposed penalty
Life jackets and belts.
Coleman Quarry · 340224630 CFR 56.15020 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Emergency medical assistance and transportation.
Coleman Quarry · 340224630 CFR 56.18014 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Immediate notification.
Coleman Quarry · 340224630 CFR 50.10(a) · $7,555.00 proposed penalty
Regular Safety and Health Inspection
Mill Creek Quarry · 340220712.8 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Chico 2 Quarry · 410482730 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Chico 2 Quarry · 410482730 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Chico 2 Quarry · 410482730 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Chico 2 Quarry · 410482730 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Chico 2 Quarry · 410482730 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Chico 2 Quarry · 410482730 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Chico 2 Quarry · 410482730 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Chico 2 Quarry · 410482730 CFR 50.30(a) · $151.00 proposed penalty
Housekeeping.
Chico 2 Quarry · 410482730 CFR 56.20003(c) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Chico 2 Quarry · 410482730 CFR 56.14100(a) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Chico 2 Quarry · 410482730 CFR 56.12008 · $151.00 proposed penalty
Housekeeping.
Chico 2 Quarry · 410482730 CFR 56.20003(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Chico 2 Quarry · 410482717.8 on-site hours reported
Compliance Follow-up Inspection
Chico 1 · 410511011.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.