  1. Electric equipment; examination, testing, and maintenance.

    violationRecord 5020940
    Switchback Loadout · 4609441

    30 CFR 77.502 · $432.00 proposed penalty

  2. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5020939
    Switchback Loadout · 4609441

    30 CFR 77.1606(c) · Significant and substantial (S&S) · $959.00 proposed penalty

  3. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5020938
    Switchback Loadout · 4609441

    30 CFR 77.1606(c) · $193.00 proposed penalty

  4. Mechanical equipment guards.

    violationRecord 5020937
    Switchback Loadout · 4609441

    30 CFR 77.400(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  5. Mechanical equipment guards.

    violationRecord 5020936
    Switchback Loadout · 4609441

    30 CFR 77.400(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  6. Temporary, portable containers.

    violationRecord 5020935
    Switchback Loadout · 4609441

    30 CFR 47.44(b) · $193.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord F00B9F3
    Switchback Loadout · 4609441

    20.0 on-site hours reported

  8. Quarterly sampling; designated work positions.

    violationRecord 5022058
    Highwall Park Surface Mine · 4609612

    30 CFR 71.206(h)(2) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  9. Quarterly sampling; designated work positions.

    violationRecord 5022057
    Highwall Park Surface Mine · 4609612

    30 CFR 71.206(h)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  10. Quarterly sampling; designated work positions.

    violationRecord 5022056
    Highwall Park Surface Mine · 4609612

    30 CFR 71.206(g) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  11. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022055
    Highwall Park Surface Mine · 4609612

    30 CFR 77.1606(c) · $883.00 proposed penalty

  12. Regular Safety and Health Inspection

    inspectionRecord F0170ED
    OLAN PROCESSING PLANT · 4609556

    24.5 on-site hours reported

  13. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5024554
    Highwall Park Surface Mine · 4609612

    30 CFR 77.1606(c) · $697.00 proposed penalty

  14. Verbal Hazard Complaint Inspections

    inspectionRecord F00ACA1
    OLAN PROCESSING PLANT · 4609556

    2.5 on-site hours reported

  15. Verbal Hazard Complaint Inspections

    inspectionRecord F0150AB
    OLAN PROCESSING PLANT · 4609556

    3.0 on-site hours reported

  16. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5020899
    Godfrey Branch Surface Mine · 4609613

    30 CFR 77.1606(c) · Significant and substantial (S&S) · $432.00 proposed penalty

  17. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5020898
    Godfrey Branch Surface Mine · 4609613

    30 CFR 77.1606(c) · $151.00 proposed penalty

  18. Written safety program.

    violationRecord 5020896
    SHM #67 · 4609374

    30 CFR 77.2102(a) · $151.00 proposed penalty

  19. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5020895
    SHM #67 · 4609374

    30 CFR 50.30(a) · $151.00 proposed penalty

  20. Noise exposure assessment.

    violationRecord 5020894
    SHM #67 · 4609374

    30 CFR 62.110(d) · $151.00 proposed penalty

  21. Highwalls, pits and spoil banks; plans.

    violationRecord 5020893
    SHM #67 · 4609374

    30 CFR 77.1000 · $697.00 proposed penalty

  22. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9843477
    Godfrey Branch Surface Mine · 4609613

    30 CFR 77.1606(c) · $4,047.00 proposed penalty

  23. Regular Safety and Health Inspection

    inspectionRecord F0170DE
    Highwall Park Surface Mine · 4609612

    32.5 on-site hours reported

  24. Quantity and location of firefighting equipment.

    violationRecord 5020892
    Godfrey Branch Surface Mine · 4609613

    30 CFR 77.1109(c)(1) · $151.00 proposed penalty

  25. Accumulations of combustible materials.

    violationRecord 5020891
    Godfrey Branch Surface Mine · 4609613

    30 CFR 77.1104 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.