Exposure limits for airborne contaminants.
Cortez District-Underground · 260257330 CFR 57.5001(a)/57.5005 · Significant and substantial (S&S) · $959.00 proposed penalty
Housekeeping.
Roaster Operations · 260267330 CFR 56.20003(a) · $883.00 proposed penalty
Retaining dams.
Roaster Operations · 260267330 CFR 56.20010 · $6,540.00 proposed penalty
Slip or fall of person
Cortez District · 2600827Days away from work only
Accident narrative
During a pre-trip inspection, the rigger was directed to the opposite side of the engine compartment. Instead of climbing down to go around, they walked across stored wood mats on the crane. The mats shifted, causing them to fall and fracture their ankle
Compliance Follow-up Inspection
Phoenix Mine · 26005502.5 on-site hours reported
Spot Inspection
Meikle Mine · 26022461.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Meikle Mine · 26022465.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Roaster Operations · 26026734.5 on-site hours reported
Examination of working places.
South Area · 260050030 CFR 56.18002 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Electrical conductors.
South Area · 260050030 CFR 56.12004 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Machinery, equipment, and tools.
Cortez District · 260082730 CFR 56.14205 · $592.00 proposed penalty
Stacking and storage of materials.
Cortez District · 260082730 CFR 56.16001 · $177.00 proposed penalty
Construction and maintenance of guards.
Cortez District · 260082730 CFR 56.14112(a)(1) · $267.00 proposed penalty
Correction of hazardous conditions.
Meikle Mine · 260224630 CFR 57.3200 · $642.00 proposed penalty
Separation of transported explosive material.
Pete Bajo · 260268930 CFR 57.6201(b)(2) · $151.00 proposed penalty
Vehicles.
Pete Bajo · 260268930 CFR 57.6202(a)(2) · $288.00 proposed penalty
Separation of transported explosive material.
Pete Bajo · 260268930 CFR 57.6201(b)(2) · $288.00 proposed penalty
Explosive material storage practices.
Pete Bajo · 260268930 CFR 57.6102 · $151.00 proposed penalty
Separation of stored explosive material.
Pete Bajo · 260268930 CFR 57.6100(a) · $959.00 proposed penalty
Inspection and cover plates.
Pete Bajo · 260268930 CFR 57.12032 · $959.00 proposed penalty
Ground support use.
Pete Bajo · 260268930 CFR 57.3360 · Significant and substantial (S&S) · $8,315.00 proposed penalty
Ground support use.
Pete Bajo · 260268930 CFR 57.3360 · Significant and substantial (S&S) · $8,315.00 proposed penalty
Regular Safety and Health Inspection
Pete Bajo · 2602689105.5 on-site hours reported
Inspection.
Pete Bajo · 260268930 CFR 57.4201(a)(5) · $288.00 proposed penalty
General requirements for boilers and pressure vessels.
Pete Bajo · 260268930 CFR 57.13001 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.