← N F C MINING, INC.

N F C MINING, INC. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Spot Inspection

    inspectionRecord F005396
    #1 PLANT · 1510271

    4.5 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F018795
    #1 PLANT · 1510271

    20.0 on-site hours reported

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5088129
    #1 PLANT · 1510271

    30 CFR 77.404(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  4. Annual refresher training of miners; minimum courses of instruction; hours of instruction.

    violationRecord 9778328
    #1 PLANT · 1510271

    30 CFR 48.28(a) · $168.00 proposed penalty

  5. Electric equipment; frequency of examination and testing.

    violationRecord 9778327
    #1 PLANT · 1510271

    30 CFR 77.502-2 · $151.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F00687C
    #1 PLANT · 1510271

    48.5 on-site hours reported

  7. Loading and haulage equipment; installations.

    violationRecord 9778239
    #1 PLANT · 1510271

    30 CFR 77.1605(d) · $151.00 proposed penalty

  8. Accumulations of combustible materials.

    violationRecord 9778238
    #1 PLANT · 1510271

    30 CFR 77.1104 · $151.00 proposed penalty

  9. Loading and haulage equipment; installations.

    violationRecord 9778237
    #1 PLANT · 1510271

    30 CFR 77.1605(b) · $151.00 proposed penalty

  10. Travelways at surface installations.

    violationRecord 9778236
    #1 PLANT · 1510271

    30 CFR 77.205(e) · Significant and substantial (S&S) · $288.00 proposed penalty

  11. Loading and haulage equipment; operation.

    violationRecord 9778235
    #1 PLANT · 1510271

    30 CFR 77.1607(cc) · $151.00 proposed penalty

  12. Mechanical equipment guards.

    violationRecord 9778234
    #1 PLANT · 1510271

    30 CFR 77.400(a) · Significant and substantial (S&S) · $288.00 proposed penalty

  13. Electric equipment; frequency of examination and testing.

    violationRecord 9778232
    #1 PLANT · 1510271

    30 CFR 77.502-2 · $151.00 proposed penalty

  14. Electric equipment; examination, testing, and maintenance.

    violationRecord 9778225
    #1 PLANT · 1510271

    30 CFR 77.502 · $151.00 proposed penalty

  15. Electric equipment; examination, testing, and maintenance.

    violationRecord 9778224
    #1 PLANT · 1510271

    30 CFR 77.502 · Significant and substantial (S&S) · $193.00 proposed penalty

  16. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778223
    #1 PLANT · 1510271

    30 CFR 77.1606(c) · $151.00 proposed penalty

  17. Electric equipment; frequency of examination and testing.

    violationRecord 9778222
    #1 PLANT · 1510271

    30 CFR 77.502-2 · $151.00 proposed penalty

  18. Regular Safety and Health Inspection

    inspectionRecord F00DEEE
    #1 PLANT · 1510271

    96.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.