Mulzer Crushed Stone Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Safety defects; examination, correction and records.
DON C. RUSHING · 150427230 CFR 56.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
DON C. RUSHING · 150427215.0 on-site hours reported
Safe access.
New Amsterdam Quarry · 120223630 CFR 56.11001 · Significant and substantial (S&S) · $366.00 proposed penalty
Safe access.
New Amsterdam Quarry · 120223630 CFR 56.11001 · $1,219.00 proposed penalty
Regular Safety and Health Inspection
New Amsterdam Quarry · 120223618.0 on-site hours reported
Regular Safety and Health Inspection
I-69 Sand Pit · 12021295.5 on-site hours reported
Safety defects; examination, correction and records.
Cape Sandy #1 · 120008430 CFR 56.14100(b) · $151.00 proposed penalty
Brakes.
Cape Sandy #1 · 120008430 CFR 56.14101(a)(3) · $151.00 proposed penalty
Electrical conductors.
Cape Sandy #1 · 120008430 CFR 56.12004 · $2,133.00 proposed penalty
Electrical conductors.
Cape Sandy #1 · 120008430 CFR 56.12004 · $193.00 proposed penalty
Correction of dangerous conditions.
Cape Sandy #1 · 120008430 CFR 56.12030 · $151.00 proposed penalty
Safety can use.
Cape Sandy #1 · 120008430 CFR 56.4402 · $151.00 proposed penalty
Illumination of surface working areas.
Charlestown Quarry · 120172030 CFR 56.17001 · $151.00 proposed penalty
Regular Safety and Health Inspection
Charlestown Quarry · 120172020.5 on-site hours reported
Correction of dangerous conditions.
Cape Sandy #1 · 120008430 CFR 56.12030 · $432.00 proposed penalty
Correction of dangerous conditions.
Cape Sandy #1 · 120008430 CFR 56.12030 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Insulation and fittings for power wires and cables.
Cape Sandy #1 · 120008430 CFR 56.12008 · $151.00 proposed penalty
Electrical conductors.
Cape Sandy #1 · 120008430 CFR 56.12004 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Cape Sandy #1 · 120008430 CFR 56.14100(b) · Significant and substantial (S&S) · $432.00 proposed penalty
Identification of power switches.
Cape Sandy #1 · 120008430 CFR 56.12018 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Cape Sandy #1 · 120008430 CFR 56.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Cape Sandy #1 · 1200084173.0 on-site hours reported
Regular Safety and Health Inspection
Riverside Stone · 151854918.0 on-site hours reported
Electrical conductors.
Temple Quarry · 120083930 CFR 56.12004 · $151.00 proposed penalty
Electrical conductors.
Temple Quarry · 120083930 CFR 56.12004 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.