Mountain Aggregates Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Training plans.
Pine Mountain Stone · 150005630 CFR 46.3(a) · $151.00 proposed penalty
Spot Inspection
Pine Mountain Stone · 150005626.0 on-site hours reported
Correction of hazardous conditions.
Pine Mountain Stone · 150005630 CFR 56.3200 · Significant and substantial (S&S) · $165.00 proposed penalty
Examination of ground conditions.
Pine Mountain Stone · 150005630 CFR 56.3401 · Significant and substantial (S&S) · $165.00 proposed penalty
Traffic control.
Pine Mountain Stone · 150005630 CFR 56.9100 · $193.00 proposed penalty
Special Emphasis Programs
Pine Mountain Stone · 15000560.0 on-site hours reported
Regular Safety and Health Inspection
Pine Mountain Stone · 150005634.5 on-site hours reported
Moving machine parts.
Pine Mountain Stone · 150005630 CFR 56.14107(a) · $504.00 proposed penalty
Abandoned electric circuits.
Pine Mountain Stone · 150005630 CFR 56.4011 · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Pine Mountain Stone · 15000565.5 on-site hours reported
Disorders (physical agents)
Pine Mountain Stone · 1500056Occupatnal illness not deg 1-6
Accident narrative
Employee suddenly became nauseous, dizziness, and lightheaded. EE was taken to the shop and brought out of the elements and treated for over exertion. EE was given fluids and cooled down when EE started cramping. 911 was called while our first responders were treating for heat exhaustion. EE was then transported to the hospital and was diagnosed with dehydration.
Spot Inspection
Pine Mountain Stone · 15000560.0 on-site hours reported
Spot Inspection
Pine Mountain Stone · 150005634.5 on-site hours reported
Construction and maintenance of guards.
Pine Mountain Stone · 150005630 CFR 56.14112(a)(2) · $226.00 proposed penalty
Construction and maintenance of guards.
Pine Mountain Stone · 150005630 CFR 56.14112(b) · $226.00 proposed penalty
Housekeeping.
Pine Mountain Stone · 150005630 CFR 56.20003(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Pine Mountain Stone · 150005630 CFR 56.14112(b) · $226.00 proposed penalty
Moving machine parts.
Pine Mountain Stone · 150005630 CFR 56.14107(a) · $818.00 proposed penalty
Safe access.
Pine Mountain Stone · 150005630 CFR 56.11001 · Significant and substantial (S&S) · $755.00 proposed penalty
Safe access.
Pine Mountain Stone · 150005630 CFR 56.11001 · Significant and substantial (S&S) · $755.00 proposed penalty
Safe access.
Pine Mountain Stone · 150005630 CFR 56.11001 · Significant and substantial (S&S) · $755.00 proposed penalty
Safe access.
Pine Mountain Stone · 150005630 CFR 56.11001 · $755.00 proposed penalty
Handrails and toeboards.
Pine Mountain Stone · 150005630 CFR 56.11002 · $504.00 proposed penalty
Safe access.
Pine Mountain Stone · 150005630 CFR 56.11001 · $2,503.00 proposed penalty
Inspection.
Pine Mountain Stone · 150005630 CFR 56.4201(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.