Mountain Aggregates Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Pine Mountain Stone · 150005648.5 on-site hours reported
Dust control.
Pine Mountain Stone · 150005630 CFR 56.9315 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Electrical conductors.
Pine Mountain Stone · 150005630 CFR 56.12004 · $151.00 proposed penalty
Barricades and warning signs.
Pine Mountain Stone · 150005630 CFR 56.20011 · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Pine Mountain Stone · 15000562.0 on-site hours reported
Handling of materials
Pine Mountain Stone · 1500056Days away from work only
Accident narrative
on 6/9/26, an employee experienced pain between EE's shoulder blades while washing beneath a conveyor. EE was evaluated at the ER and diagnosed with a muscle strain. Light duty was recommended for 5 days but did not affect EE's normal duties as Plant operator. EE continued working without missed time or reported issues until recently submitting an off-work note.
Verbal Hazard Complaint Inspections
Pine Mountain Stone · 15000561.5 on-site hours reported
Verbal Hazard Complaint Inspections
Pine Mountain Stone · 150005610.0 on-site hours reported
Verbal Hazard Complaint Inspections
Pine Mountain Stone · 150005617.0 on-site hours reported
Safe access.
Pine Mountain Stone · 150005630 CFR 56.11001 · Significant and substantial (S&S) · $336.00 proposed penalty
Berms or guardrails.
Pine Mountain Stone · 150005630 CFR 56.9300(b) · Significant and substantial (S&S) · $504.00 proposed penalty
Safe access.
Pine Mountain Stone · 150005630 CFR 56.11001 · Significant and substantial (S&S) · $336.00 proposed penalty
Brakes.
Pine Mountain Stone · 150005630 CFR 56.14101(a)(2) · $151.00 proposed penalty
Moving machine parts.
Pine Mountain Stone · 150005630 CFR 56.14107(a) · $336.00 proposed penalty
Moving machine parts.
Pine Mountain Stone · 150005630 CFR 56.14107(a) · $336.00 proposed penalty
Handrails and toeboards.
Pine Mountain Stone · 150005630 CFR 56.11002 · $267.00 proposed penalty
Brakes.
Pine Mountain Stone · 150005630 CFR 56.14101(a)(2) · $151.00 proposed penalty
Housekeeping.
Pine Mountain Stone · 150005630 CFR 56.20003(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Pine Mountain Stone · 150005630 CFR 56.14112(b) · $151.00 proposed penalty
Construction and maintenance of guards.
Pine Mountain Stone · 150005630 CFR 56.14112(b) · Significant and substantial (S&S) · $755.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Pine Mountain Stone · 150005630 CFR 50.30(a) · $151.00 proposed penalty
Examination of working places.
Pine Mountain Stone · 150005630 CFR 56.18002(b) · $336.00 proposed penalty
Maintenance of records.
Pine Mountain Stone · 150005630 CFR 50.40(b) · $151.00 proposed penalty
Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.
Pine Mountain Stone · 150005630 CFR 48.23(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Pine Mountain Stone · 150005673.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.