Morton Salt Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Safety defects; examination, correction and records.
GRAND SALINE OPERATIONS · 410177630 CFR 57.14100(c) · $151.00 proposed penalty
Protection of power conductors from mobile equipment.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12005 · $226.00 proposed penalty
Construction and maintenance of guards.
GRAND SALINE OPERATIONS · 410177630 CFR 57.14112(b) · $226.00 proposed penalty
Insulation and fittings for power wires and cables.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12008 · $288.00 proposed penalty
Inspection and cover plates.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12032 · $336.00 proposed penalty
Grounding circuit enclosures.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12025 · $151.00 proposed penalty
Inspection and cover plates.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12032 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Electrical conductors.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12004 · $151.00 proposed penalty
Electrical conductors.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12004 · $151.00 proposed penalty
Electrical conductors.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12004 · $151.00 proposed penalty
Inspection and cover plates.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12032 · $336.00 proposed penalty
Inspection and cover plates.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12032 · Significant and substantial (S&S) · $5,574.00 proposed penalty
Safety defects; examination, correction and records.
GRAND SALINE OPERATIONS · 410177630 CFR 57.14100(c) · $151.00 proposed penalty
Taglines, hitches, and slings.
GRAND SALINE OPERATIONS · 410177630 CFR 57.16007(b) · $151.00 proposed penalty
Inspection and cover plates.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12032 · $336.00 proposed penalty
Requirement for container labels.
GRAND SALINE OPERATIONS · 410177630 CFR 47.41(a) · $151.00 proposed penalty
First aid materials.
GRAND SALINE OPERATIONS · 410177630 CFR 57.15001 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12008 · $288.00 proposed penalty
Taglines, hitches, and slings.
GRAND SALINE OPERATIONS · 410177630 CFR 57.16007(b) · $151.00 proposed penalty
Correction of dangerous conditions.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12030 · $151.00 proposed penalty
Construction and maintenance of guards.
GRAND SALINE OPERATIONS · 410177630 CFR 57.14112(a)(2) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Machinery, equipment, and tools.
GRAND SALINE OPERATIONS · 410177630 CFR 57.14205 · $151.00 proposed penalty
Inspection and cover plates.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12032 · $336.00 proposed penalty
Housekeeping.
GRAND SALINE OPERATIONS · 410177630 CFR 57.20003(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Electrical conductors.
GRAND SALINE OPERATIONS · 410177630 CFR 57.12004 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.