MLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Slip or fall of person
MLC - Ste. Genevieve · 2300542Days restricted activity only
Accident narrative
Employee was descending the MROT storeroom stairs carrying boxes. Once EE got to the bottom of the staircase, started walking to leave storeroom, and tripped over pallet that was in walkway causing EE to fall on EE's arms/shoulder. Employee had an MRI that showed a broken bone in the shoulder as well as a torn labrum after follow-up with orthopedic on 4/17/2025.
Machinery
MLC - Ste. Genevieve · 2300542Dys awy frm wrk & restrctd act
Accident narrative
Haul truck operator was getting loaded and on the last bucket EE experienced a jolting feeling that caused pain in EE's back.
Other
MLC - Ste. Genevieve · 2300542No dys awy frm wrk,no rstr act
Accident narrative
Employee was cleaning along 19 belt when a gust of wind blew stone dust into EE's eyes. EE washed out eyes and assumed there would be no further issues. The eye irritation continued and got worse over the following days. Employee was given prescription eye medication on 3/8/2025.
Spot Inspection
MLC - Ste. Genevieve · 23005425.5 on-site hours reported
Verbal Hazard Complaint Inspections
MLC - Ste. Genevieve · 23005424.3 on-site hours reported
Splices and repairs of power cables.
MLC - Ste. Genevieve · 230054230 CFR 57.12013(b) · $755.00 proposed penalty
Electrical conductors.
MLC - Ste. Genevieve · 230054230 CFR 57.12004 · Significant and substantial (S&S) · $9,004.00 proposed penalty
Construction and maintenance of guards.
MLC - Ste. Genevieve · 230054230 CFR 57.14112(b) · $336.00 proposed penalty
Electrical conductors.
MLC - Ste. Genevieve · 230054230 CFR 57.12004 · Significant and substantial (S&S) · $9,004.00 proposed penalty
Correction of dangerous conditions.
MLC - Ste. Genevieve · 230054230 CFR 57.12030 · Significant and substantial (S&S) · $5,574.00 proposed penalty
Inspection and cover plates.
MLC - Ste. Genevieve · 230054230 CFR 57.12032 · Significant and substantial (S&S) · $6,540.00 proposed penalty
Electrical conductors.
MLC - Ste. Genevieve · 230054230 CFR 57.12004 · Significant and substantial (S&S) · $9,004.00 proposed penalty
Electrical conductors.
MLC - Ste. Genevieve · 230054230 CFR 57.12004 · $1,818.00 proposed penalty
Moving machine parts.
MLC - Ste. Genevieve · 230054230 CFR 57.14107(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Construction and maintenance of guards.
MLC - Ste. Genevieve · 230054230 CFR 57.14112(b) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Housekeeping.
MLC - Ste. Genevieve · 230054230 CFR 57.20003(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Housekeeping.
MLC - Ste. Genevieve · 230054230 CFR 57.20003(a) · $592.00 proposed penalty
Electrical conductors.
MLC - Ste. Genevieve · 230054230 CFR 57.12004 · Significant and substantial (S&S) · $11,450.00 proposed penalty
Electrical conductors.
MLC - Ste. Genevieve · 230054230 CFR 57.12004 · Significant and substantial (S&S) · $11,450.00 proposed penalty
Housekeeping.
MLC - Ste. Genevieve · 230054230 CFR 57.20003(a) · $2,503.00 proposed penalty
Housekeeping.
MLC - Ste. Genevieve · 230054230 CFR 57.20003(a) · $2,503.00 proposed penalty
Housekeeping.
MLC - Ste. Genevieve · 230054230 CFR 57.20003(a) · $2,503.00 proposed penalty
Housekeeping.
MLC - Ste. Genevieve · 230054230 CFR 57.20003(a) · Significant and substantial (S&S) · $12,403.00 proposed penalty
Housekeeping.
MLC - Ste. Genevieve · 230054230 CFR 56.20003(a) · $267.00 proposed penalty
Housekeeping.
MLC - Ste. Genevieve · 230054230 CFR 57.20003(a) · $755.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.