Ventilation controls.
Mountaineer II Mine · 460902930 CFR 75.333(d)(3) · $288.00 proposed penalty
Fall of roof or back
Mountaineer II Mine · 4609029Accident only
Accident narrative
An unplanned roof fall occurred on 2 Gas Mainline 3 section at 38 crosscut, #3 intersection, in the last open break.
Non-Injury Accident Investigation
Mountaineer II Mine · 46090294.0 on-site hours reported
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 5.5 on-site hours reported
Protection from falls of roof, face and ribs.
Mountaineer II Mine · 460902930 CFR 75.202(a) · $549.00 proposed penalty
Other safeguards.
Mountaineer II Mine · 460902930 CFR 75.1403 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Weekly examination.
Mountaineer II Mine · 460902930 CFR 75.364(b)(2) · $1,431.00 proposed penalty
Violation — cited standard not reported
Mountaineer II Mine · 4609029Protection from falls of roof, face and ribs.
Mountaineer II Mine · 460902930 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $267.00 proposed penalty
Mechanical equipment guards.
Mountaineer II Mine · 460902930 CFR 75.1722(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Permissible electric face equipment; maintenance.
Mountaineer II Mine · 460902930 CFR 75.503 · $465.00 proposed penalty
Power wires and cables; insulation and protection.
Mountaineer II Mine · 460902930 CFR 75.517 · Significant and substantial (S&S) · $6,037.00 proposed penalty
Cable fittings; suitability.
Mountaineer II Mine · 460902930 CFR 75.515 · $288.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $592.00 proposed penalty
Other safeguards.
Mountaineer II Mine · 460902930 CFR 75.1403
Permissible electric face equipment; maintenance.
Mountaineer II Mine · 460902930 CFR 75.503 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
Mountaineer II Mine · 460902930 CFR 75.503 · $465.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 6.5 on-site hours reported
Clamping of trailing cables to equipment.
Mountaineer II Mine · 460902930 CFR 75.605 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $642.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $642.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $592.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $642.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.