← Mingo Logan Coal LLC

Mingo Logan Coal LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 5132406
    Mountaineer II Mine · 4609029

    30 CFR 75.333(c)(1) · $288.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 5098506
    Mountaineer II Mine · 4609029

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5098505
    Mountaineer II Mine · 4609029

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  4. Spot Inspections

    inspectionRecord F00CDCE
    Mountaineer II Mine · 4609029

    103(i) · 3.0 on-site hours reported

  5. Accumulation of combustible materials.

    violationRecord 5132405
    Mountaineer II Mine · 4609029

    30 CFR 75.400 · $592.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5132404
    Mountaineer II Mine · 4609029

    30 CFR 75.370(a)(1) · $465.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5132403
    Mountaineer II Mine · 4609029

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 5132402
    Mountaineer II Mine · 4609029

    30 CFR 75.202(a) · $366.00 proposed penalty

  9. Inspection of fire suppression devices.

    violationRecord 5098504
    Mountaineer II Mine · 4609029

    30 CFR 75.1107-16(b) · Significant and substantial (S&S) · $697.00 proposed penalty

  10. Power wires and cables; insulation and protection.

    violationRecord 5132401
    Mountaineer II Mine · 4609029

    30 CFR 75.517 · $504.00 proposed penalty

  11. Drill dust control at underground areas of underground mines.

    violationRecord 5132400
    Mountaineer II Mine · 4609029

    30 CFR 72.630(b) · $209.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5096999
    Mountaineer II Mine · 4609029

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  13. Frequency of examinations.

    violationRecord 5098503
    Mountaineer II Mine · 4609029

    30 CFR 75.512-2 · $151.00 proposed penalty

  14. Power wires and cables; insulation and protection.

    violationRecord 5098502
    Mountaineer II Mine · 4609029

    30 CFR 75.517 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5098501
    Mountaineer II Mine · 4609029

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 5096998
    Mountaineer II Mine · 4609029

    30 CFR 75.517 · $504.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5096997
    Mountaineer II Mine · 4609029

    30 CFR 75.400 · $267.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5096996
    Mountaineer II Mine · 4609029

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  19. Permissible electric equipment.

    violationRecord 5096995
    Mountaineer II Mine · 4609029

    30 CFR 75.500(c) · $432.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F0106F3
    Mountaineer II Mine · 4609029

    103(i) · 5.5 on-site hours reported

  21. Mine ventilation plan; submission and approval.

    violationRecord 9839698
    Mountaineer II Mine · 4609029

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $29,904.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5098500
    Mountaineer II Mine · 4609029

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5096994
    Mountaineer II Mine · 4609029

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  24. Violation — cited standard not reported

    violationRecord 5096077
    Mountaineer II Mine · 4609029

    $1,866.00 proposed penalty

  25. Electric equipment; examination, testing, and maintenance.

    violationRecord 5096305
    Cardinal Preparation Plant · 4609046

    30 CFR 77.502 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.