Mingo Logan Coal LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Escapeways; bituminous and lignite mines.
Mountaineer II Mine · 460902930 CFR 75.380(f)(1) · $959.00 proposed penalty
Maintenance of incombustible content of rock dust.
Mountaineer II Mine · 460902930 CFR 75.403 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Mountaineer II Mine · 460902930 CFR 75.370(a)(1) · $209.00 proposed penalty
Quarterly sampling; mechanized mining units.
Mountaineer II Mine · 460902930 CFR 70.208(b)(3) · $2,133.00 proposed penalty
Mine ventilation plan; submission and approval.
Mountaineer II Mine · 460902930 CFR 75.370(a)(1) · $465.00 proposed penalty
Maintenance of incombustible content of rock dust.
Mountaineer II Mine · 460902930 CFR 75.403 · $151.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 6.5 on-site hours reported
Roof testing and scaling.
Mountaineer II Mine · 460902930 CFR 75.211(d) · $288.00 proposed penalty
On-shift examination.
Mountaineer II Mine · 460902930 CFR 75.362(a)(2) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Permissible electric face equipment; maintenance.
Mountaineer II Mine · 460902930 CFR 75.503 · $226.00 proposed penalty
Deenergization of self-propelled electric face equipment installation requirements.
Mountaineer II Mine · 460902930 CFR 75.523-1(a) · $193.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $267.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Cardinal Preparation Plant · 460904630 CFR 77.1606(c) · $151.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 9.3 on-site hours reported
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $592.00 proposed penalty
Protection from falls of roof, face and ribs.
Mountaineer II Mine · 460902930 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Drill dust control at underground areas of underground mines.
Mountaineer II Mine · 460902930 CFR 72.630(b) · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $177.00 proposed penalty
Ventilation controls.
Mountaineer II Mine · 460902930 CFR 75.333(e)(1)(ii) · $288.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $177.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 8.3 on-site hours reported
Power wires and cables; insulation and protection.
Mountaineer II Mine · 460902930 CFR 75.517 · $465.00 proposed penalty
Power wires and cables; insulation and protection.
Mountaineer II Mine · 460902930 CFR 75.517 · $1,037.00 proposed penalty
Roof control plan.
Mountaineer II Mine · 460902930 CFR 75.220(a)(1) · $642.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.