Short circuit protection; ratings and settings of circuit breakers.
Mountaineer II Mine · 460902930 CFR 75.601-1 · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Mountaineer II Mine · 460902919.8 on-site hours reported
Mine ventilation plan; submission and approval.
Mountaineer II Mine · 460902930 CFR 75.370(a)(1) · $465.00 proposed penalty
Protection from falls of roof, face and ribs.
Mountaineer II Mine · 460902930 CFR 75.202(a) · $209.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
Mountaineer II Mine · 460902930 CFR 75.1600-2(e) · $151.00 proposed penalty
Inspection of fire suppression devices.
Mountaineer II Mine · 460902930 CFR 75.1107-16(b) · $336.00 proposed penalty
Accumulation of combustible materials.
Mountaineer II Mine · 460902930 CFR 75.400 · $245.00 proposed penalty
Preshift examination at fixed intervals.
Mountaineer II Mine · 460902930 CFR 75.360(f) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Mountaineer II Mine · 460902930 CFR 75.503 · $504.00 proposed penalty
Preshift examination at fixed intervals.
Mountaineer II Mine · 460902930 CFR 75.360(f) · $151.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 15.5 on-site hours reported
Preshift examination at fixed intervals.
Mountaineer II Mine · 460902930 CFR 75.360(f) · $151.00 proposed penalty
Proximity detection systems.
Mountaineer II Mine · 460902930 CFR 75.1732(b)(2) · $755.00 proposed penalty
Protection from falls of roof, face and ribs.
Mountaineer II Mine · 460902930 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Roof control plan.
Mountaineer II Mine · 460902930 CFR 75.220(a)(1) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Machinery and equipment; operation and maintenance.
Mountaineer II Mine · 460902930 CFR 75.1725(a) · Significant and substantial (S&S) · $504.00 proposed penalty
Ventilation controls.
Mountaineer II Mine · 460902930 CFR 75.333(c)(3) · $226.00 proposed penalty
Weekly examination.
Mountaineer II Mine · 460902930 CFR 75.364(a)(1) · Significant and substantial (S&S)
Mine ventilation plan; submission and approval.
Mountaineer II Mine · 460902930 CFR 75.370(a)(1) · $13,436.00 proposed penalty
Spot Inspections
Mountaineer II Mine · 4609029103(i) · 5.5 on-site hours reported
Other safeguards.
Mountaineer II Mine · 460902930 CFR 75.1403 · $267.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Mountaineer II Mine · 460902930 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mountaineer II Mine · 460902930 CFR 75.512 · $209.00 proposed penalty
Impoundment Spot Inspection
Cardinal Preparation Plant · 46090464.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.